1 / 22

CLIC choke mode structure and X-band activities in Tsinghua University.

CLIC choke mode structure and X-band activities in Tsinghua University. Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) 2014.02.04 CLIC Workshop 2014. Outline. Review of Choke mode design RF measurement Wakefield experiment

whitby
Download Presentation

CLIC choke mode structure and X-band activities in Tsinghua University.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC choke mode structure and X-band activities in Tsinghua University. Jiaru Shi(Department of Engineering Physics, Tsinghua University) HaoZha (CERN) 2014.02.04 CLIC Workshop 2014

  2. Outline • Review of Choke mode design • RF measurement • Wakefield experiment • On progressing and future plan • Other X-band activities at Tsinghua last year • Acknowledgment • Collaboration with CLIC study • Collaboration with AWA (ANL) and Euclid Lab. • Accelerating Group in Tsinghua

  3. Overview of CDS design

  4. S12 Absorbed by load New choke design (CDS-C) • Improved features include: • “Two section” design: avoid parasitic mode (~30GHz) • “Thin-neck” design and “matching” design: reduce reflection of HOMs from choke. • “Dipole detuning” design: detune two low-band dipole modes in one cell 2.0mm 1.2mm 1.6mm S11

  5. Damping result Experimental results. Click here

  6. From CDS-C to CDS-D • Optimized on distributions of iris size on each cell. • Using genetic algorithm. • W⊥(0.15m)~4V/pC/m/mm; • Fc=1.01; Frms=3.8; Fworst=35. * Reference: Phys. Rev. ST Accel. Beams 12, 102001 (2009)

  7. From CDS-C to CDS-D CDS-C CDS-D * Reference: Phys. Rev. ST Accel. Beams 12, 102001 (2009)

  8. RF measurements S12 absorbed in theload • Radial line experiments are applied to: • test the reflection of RF load (SiC pieces) • verify HOMs absorption in choke structure • Calibration using multi-short load (> 3). S11 To VNA Place RF load

  9. Radial line experiments • Using Agilent E8364B VNA,10MHz~50GHz. (Equipments supported by Department of Electronic Engineering, Tsinghua University) Calibration error and results

  10. Reflection of RF load a=b=9.5mm,c=0.1mm • Material EcasicP, provide by CERN. • Results are promising (lower than -20dB).

  11. HOMs absorption in choke Frequency of Parasitic mode Matching steps Increase the absorption

  12. Wakefield experiment at AWA(ANL) oscilloscope 1# 4# 2# 3# G1 beam line: laser trigger breakdown experiment G3 (Drive) beam line: 75MeV, >100nC Can produce Bunch train G2 (Witness) beam line: 15MeV, 1~100nC

  13. Set up experiments G2 Beam line set up for CLIC-choke-mode experiments Be windows:50.4um thickness; For 14MeV electron beam, ~30% (calculated by Fluka) of the beam can pass it without any scattering. Optimized on beam dynamics: 1nC Beam size: ~0.7m, 5nC Beam size: ~1.6m, Beam aperture: 5.5mm Chamber Spectrometer GUN LINAC ICT ICT

  14. Set up experiments • Aluminium cells, SiC load (reproduced in U.S.). • Coaxial RF cable (0.59mm outer radius, magnetic probe) • 20GHz oscilloscope, 0~20GHz mixer

  15. Experimental results Q (@12GHz)=160~400 Q (@16GHz)=12.5 Q (@19GHz)=15.3 • Signal of cable 3#; • 10dB Attenuator, No mixer; • Frequency and Q results are good! Unidentified Fundamental mode Low-band Dipole mode at 16GHz and 19GHz Looks like the dipole mode at 50-22= 28GHz

  16. On progressing and future plan • Single cell SW structure to test breakdown behavior in the choke. Hope to tested in KEK. • 6-cell choke-mode structures with tuning manufacturing in Tsinghua. Full structure for high-gradient test will be developed later. • Two beam experiments?

  17. X-band structure assembly in Tsinghua • T24 pieces from CERN; • Bonding and brazing (testing): • Vacuum leak tested OK! • Assembly and Tuning (Later)

  18. An X-band (Copper) Power Extractor for ANL

  19. Infrastructure update for X-band • Cleaning room for high gradient structure (plus a new 40GHz VNA); • Upgrade of H-furnace for brazing: More precisely control for temperature in real time.

  20. Thank you

  21. Multiple short Calibration • x:refl. from coaxial (measured) • y:refl. from radial line (calc.) • s11,D,s22: to be solved ……

  22. Wakefield measurement results

More Related