1 / 20

by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

SAC MEETING WETLAND PROJECTS 06/07/06. by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju. P URDUE U N I V E R S I T Y. Test site. Near city of Greenfield due east of Indianapolis on I-70. Greenfield Wetland System Schematic. Effluent.

Download Presentation

by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAC MEETING WETLAND PROJECTS 06/07/06 by Shih-Chieh Kao, Rebeka Sultana, T.P. Chan Tom Konopka, Tom Cooper J. Alleman, R.S. Govindaraju PURDUE UNIVERSITY

  2. Test site Near city of Greenfield due east of Indianapolis on I-70.

  3. Greenfield Wetland System Schematic Effluent LS-4 M-4 ST-1 ST-2 (To city) AS-2 LS-1 F-1 AS-1 M-1 AS-4 LS-3 F-3 ACT-1 M-3 W-3 Wetland Cell (W-1) Wetland Cell (W-2) Recirculation Biofield ACT-2 LS-2 LS-2 M-2 F-2 FS N Not to scale AS-3 Weather station Lift station/Dosing Chamber V notch weir Flow meter Flume Flow meter Automatic Sampling Station Magnetic Flow meter Flow splitter

  4. Treatment Performance

  5. Wetland Performance Table: Wetland performance

  6. WETLAND DATA AVAILABILITY Credit : Shih-Chieh Kao, PhD Candidate

  7. Data Analysis Oct 22nd to Nov 22nd, 2004 September, 2004 June, 2004

  8. Data Analysis (Contd…) October, 2004

  9. Data Analysis (Contd…) Last 10 days in April,2004 Last 10 days in April,2004 Last 10 days in April,2004

  10. Data Analysis (Contd…) Last 20 days in November, 2005 Last 10 days in Oct, 2004

  11. Hydraulic flow model Recirculation W-1 83% M-1 LS-1 F-1 ST-2 ACT LS-2 Rain W-2 M-2 17% Biofield F-2 LS-3 ?% W-3 M-3 F-3 ?% M-4 LS-4 Greenfield city

  12. Model Inputs November 1 to 10, 2004

  13. Model Results

  14. Model Results (contd…)

  15. Model Results (contd…) Volumetric efficiency:

  16. Model Validation Input Data: October 22nd to October 31st, 2004

  17. Model Validation (Contd…) Output from F-2 Output from F-3

  18. Model Validation (Contd…) Output from M-1 Output from M-2

  19. Model Validation (Contd…) Output from M-3 Output from M-4

  20. Items for Discussion • SCADA • Data since January 2006-who has it? How can we access it? • Training schedule & website access • Surge tank control of flow rates • PLANTS • Clyde Mason recently did some replanting… • INSTRUMENTS • Gaps in data because of equipment failure, data logger unplugged during constructions, etc. • Inherent measurement problems with instruments • Recycle pumps not working (May 22, 2006) • BIOFIELD • No samples available, except for once in the deepest well • Supply to biofield should be shut off. • DATA AVAILABILITY • Should raw data be put on website? • Or this presentation enough detail. • REPORTS • Under preparation • Any suggestions? • Will seek feedback • OTHER ?

More Related