10 likes | 136 Views
Design/Develop Support Subsystem. INPUTS Maintenance Task Analysis ILC Quad Model RAM predictions FMECA LORA RCM DT Plans/ Reports TEMP Supportability Demonstration Plan Contract ORD/COE. OUTPUTS Fielding Plan Supportability Plan: Maintenance Plan System Support Package
E N D
Design/Develop Support Subsystem INPUTS Maintenance Task Analysis ILC Quad Model RAM predictions FMECA LORA RCM DT Plans/ Reports TEMP Supportability Demonstration Plan Contract ORD/COE • OUTPUTS • Fielding Plan • Supportability Plan: • Maintenance Plan • System Support Package • Test Support Package • Configuration Baseline Design/Develop Support Subsystem = Logistician Responsibility = Requires Logistician Input Back to Core Process