1 / 12

Mini Baja II

Mini Baja II. Adam Howe Jeremy Stout Matt Bennett Lance Allen Will Radford Daniel Schaugaard Dustin Wallis Josh Banks. Presentation Outline. Customer Requirements Static Dynamic Benchmarking Suspension Powertrain Frame Project Updates Modeling Donations Project Progression

will
Download Presentation

Mini Baja II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mini Baja II • Adam Howe • Jeremy Stout • Matt Bennett • Lance Allen • Will Radford • Daniel Schaugaard • Dustin Wallis • Josh Banks

  2. Presentation Outline • Customer Requirements • Static • Dynamic • Benchmarking • Suspension • Powertrain • Frame • Project Updates • Modeling • Donations • Project Progression • Summary

  3. Static Capable of carrying a standard person Moderate width and length Low maintenance Safe operation Low cost Adequate driver restraint Adequate driver protection Adequate ground clearance Can be manufactured by semi-skilled laborer, using standard machine tools and parts Visually appealing Dynamic Easy maneuverability Fast acceleration Able to ascend steep grades Adequate traction Moderate towing capacity Reliable Easy to operate Use of commercially available engine Customer Requirements

  4. Benchmarking • Suspension • Trailing Arm Vs. A-arm • Powertrain • FWD/REV/HI/LO • Limited Slip • Frame • Performance Vs. Comfort

  5. Suspension

  6. Powertrain

  7. Frame

  8. Project Updates • Modeling • Sponsors • Project Progression

  9. Modeling

  10. Donations • Previously Projected Budget $4,050 • Updated Budget $6,530 • Secured Donations $3,400 • Pending Donations $2,400

  11. Project Progression • Current Tasks • Donations • Suspension & Control Arms • Drivetrian Design • Frame Design • Future Tasks • Component Modeling

  12. Summary • Customer Requirements • Benchmarking • A-Arm • Project Updates • Budget Total • $6,530

More Related