ABDA Training Module 4: Depot Training. Contents. Basic Sorting – ABCRC ISB packaging and pallet stacking BCMB Database CVR Form ABCRC Audit Process Progressive Action Policy. Basic Sorting - ABCRC. Aluminum Cans PET HDPE Glass Bi-Metal. Basic Sorting – (cont.). Paperboard

willa-craft
Download Presentation

ABDA Training Module 4: Depot Training

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ABDA Training Module 4: Depot Training

  2. Contents • Basic Sorting – ABCRC • ISB packaging and pallet stacking • BCMB Database • CVR Form • ABCRC Audit Process • Progressive Action Policy

  3. Basic Sorting - ABCRC • Aluminum Cans • PET • HDPE • Glass • Bi-Metal

  4. Basic Sorting – (cont.) • Paperboard / Gabletop • Tetra Brik • Drink Pouches • Other Plastics (for 0-1L, contains PET Color, all HDPE, polypropylene, and #3, #6, #7 plastics, for >1L, contains PET color, HDPE color, polypropylene and #3, #6, #7 plastics)

  5. Schedule A (from ABDA-ABCRC Service Agreement)

  6. Clear vs Color PET/HDPE • Threshold is the light-blue Dasani Bottle

  7. ISB packing • ISBs can be packed in existing packaging, or packed into “repack” trays. All bottles must be checked for damage and removed if chipped or broken.

  8. Other Containers • There are three other types of bottles that go to BDL: Sleeman, Steamwhistle and Tree Brewery • You are also required to purchase broken ISBs, provided they do not pose a safety risk to you or your staff • These containers must be added as an extra layer on top of your pallet

  9. Pallet Building • Each layer should have the opposite configuration as the layer underneath. • Depots are expected to stack 7 layers per pallet unless agreed to with BDL

  10. Finishing off the Pallet • Affix the label onto the narrow side of the pallet • Secure the top and middle layers with twine or plastic string

  11. BCMB Database • Tool for checking which beverage containers are registered • http://breg.bcmb.ab.ca/ username : depot password : collection

  12. BCMB Database (cont.) • Full instructions can be found in the E-Access Guide, which can be found on the AlbertaDepot.ca Depot section

  13. Container Validation Request Form (CVR Form) • Formerly known as suspicious container form • Used to identify unregistered containers • Concern is about large loads of containers from Out of Province, direct from Manufacturer or without deposit paid • Fill out even if customer leaves, and send to BCMB • BCMB will alert Depots in the area

  14. CVR (cont.)

  15. CVR (cont.)

  16. ABCRC Audit Process • 3 types of Audits • Random/Random • Computer-generated audit • Non-Depot specific • Used to measure performance of the system • Cannot be used to extrapolate • Target/Random • Computer-generated audits • Can be Depot specific • Used to measure performance of a Depot • Can be used to extrapolate on entire load • Target/Target • Employee-generated audit • Non-depot specific • Used to verify count in a specific bag • Cannot be used to extrapolate

  17. ABCRC Audit Process (cont.) • 2 Methodologies • Manual Counts • Containers thrown down large tubes with counting mechanism at the bottom one by one • Mis-sorted containers removed and kept aside INSERT VIDEO

  18. ABCRC Audit Process (cont.) • Automated Counts (Aluminum Cans only) • Containers loaded into an AnkerAnderson counting machine • Crushed containers put down chutes (similar to manual counts) • Mis-sorted containers removed and kept aside • INSERT VIDEO

  19. ABCRC Audit Process • Two Zones • If Actual Count is within 2.5% of Expected Count (count noted on tag, or if none, Standard Count) • Depot is paid on Expected count • If Actual Count is more than 2.5% from Expected Count • Depot is paid Deposit and Handling Commission on Actual Count • Depot is paid Deposit on mis-sorted containers but no Handling Commission • If bags of the same material stream average over 2.5%, average is extrapolated over the whole material stream for that load

  20. ABCRC Audit Process (cont.) • Mis-tagged bags • If more than 50% of containers in bag are of a different material stream, then tag is changed to the new material stream • Expected Count is changed to Standard Count of new material stream - if tag does not match the material stream, or if count is different from Standard Count, write it on all parts of the tag

  21. ABCRC Audit Process (cont.) • Communications • ABCRC will contact Depot within 1 Business Day of off-load and identify which bags are being audited • ABCRC will contact Depot within 2 Business Days of audit to communicate results • Depot has until end of next business day of Depot Operations to communicate intention if challenging the result

  22. ABCRC Audit Process (cont.) • If Depot does not communicate intent, it will be assumed that Depot agrees with result • If Depot challenging the result, it has 3 Business Days to arrange for re-count • If Depot cannot attend a re-count, the ABDA and/or BCMB can attend on their behalf • Depot must communicate all intentions by fax or electronically

  23. Depot Progressive Action Policy (PAP) • PAP is meant to allow the BCMB to take action when Depots are not in compliance with accuracy and reporting for shipments • There are two ways of entering the PAP: a. Variance in Expected Count of containers in one load b. Variance over a 3-month rolling period

  24. PAP (cont.) • Variance over a load: • Variance Zones for a single shipping container • Zone 1: 0% - 2.5% variance of Actual from Expected • Zone 2: 2.5% - 3.5% variance of Actual from Expected • Zone 3: >3.5% variance of Actual from Expected • Variance on material stream: • Material stream variance of over 7% of Actual from Expected in any one audit

  25. PAP (cont.) • Entrance Criteria • Material Stream Variance of over 7% • 3 month average of audits have per bag variance of over $2.25

  26. PAP (cont.) • Movement between Zones • Zone 1 audit results in going down in Levels • Zone 2 audit results in staying at the same Level • Zone 3 audit results in increasing in Level • Levels • Level 1 : Least Concern  used as indication that something went wrong at Depot • Level 2 : Increased Concern  ABDA is now notified • Level 3 : Critical Phase  negative audit may mean BCMB Board review of Depot Permit

  27. PAP (cont.) • Compliance Fees • When in PAP, Zone 2 and 3 audits result in $200 levy • When in Level 2 or 3 and Zone 2 or 3 audit result, audit costs are applied on a per bag basis of $50 • Grace Period • A 10 day grace period is given in between PAP audits to give the Depot time to make operational changes

  28. PAP (cont.)

  29. PAP (cont.)