RTU Savings/ MWa – NPCC 6 th Power Plan

Review: Standard Protocol for Measurement of Fan and Cooling Savings from Commercial-Sector Packaged Rooftop HVAC Units Regional Technical Forum February 14, 2012. RTU Savings/ MWa – NPCC 6 th Power Plan. RTUs in 6 th Power Plan….

Download Presentation

RTU Savings/ MWa – NPCC 6 th Power Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Review:Standard Protocol for Measurement of Fan and Cooling Savings from Commercial-Sector Packaged Rooftop HVAC UnitsRegional Technical ForumFebruary 14, 2012

  2. RTU Savings/MWa– NPCC 6thPower Plan

  3. RTUs in 6th Power Plan…

  4. NW Commercial Building Stock Assessment(CBSA) RTU counts-6th Power Plan 52% floor area <50kSf Population 64% of buildings <6 tons 79% of buildings <10 tons

  5. PNW RTUs an aging fleet… 51% = 204,000 of the units have been on the roof for over a decade!

  6. RTU Protocol Issues Raised • Measure exclusions: which measure are excluded even though not tested? • Pre and Post upgrade scheduling: can we do Pre in August and Post in May? • Multiple annual site review to better understand confidence interval • Cost to implement the protocol needs closer review: cost estimate based on mature program and lessons learned • Calculator is for a single unit; sampling protocol is for program evaluation purposes, not unit savings calculations • All protocols and calculators will need ongoing RTF support (2013 work plan/budget)

  7. RTU Protocol Confidence LimitsLimited Sites • Confidence limits are normalized relative to annual energy • Confidence limits highest for metering periods starting in late June to mid-July • Confidence limits of +- 5% are achieved with metering periods starting in late May and early August

  8. Assessment of 90% Confidence Intervals (West)

  9. Assessment of 90% Confidence Intervals (East)

  10. Nominal 90% Confidence Intervals (East)(Actual coverage rate around 50%)

  11. Nominal 90% Confidence Intervals (West)(Actual coverage rate around 50%)

  12. RTU M&V Field Protocol • Purpose • Definition of Key Terms • Required Knowledge and Skills of Practitioner • Required Data Logger Commissioning • One Time Site Measurements and Descriptions • Data Logger Measurements • TMY3 Weather Data • Savings Estimation Steps • Estimate of Typical Measurement Cost • Relationship to Other Protocols and Guidelines • Sampling Procedure for Program Evaluation

  13. Purpose • Establishes a method by which annual electrical cooling and fan energy use and savings (kWh) can be estimated for a commercial packaged rooftop unit (RTU) optimized for performance including in-field data collection requirements/methods, annualized use/savings calculation method

  14. Definition of Key Terms • Baseline • Pre • Post • Commissioning: • data logger/storage/comm equipment • RTU post-upgrade • Upgrade Measures

  15. Required Knowledge and Skills of Practitioner • Appropriate electrical and related safety procedures • Knowing the protocol and calculator • Equipment inspection: control points, schedules, cooling stages • Logging equipment selection and use • Measurement equipment commissioning • Ability to interpret results

  16. Required Data Logger Commissioning • Communications & data storage • True power sampling with current transducers @ 3-minute interval • If site temperature measurement is used, verify temperatures with 2nd instrument • If supply air temperature is used, place away from supply air plenum walls • Full data set should be tested immediately • Onboard data storage up to 70 days @ 3-min interval

  17. Key Measurement Considerations • Outdoor air temperature on site or nearby NOAA weather station • Supply air temperature optional: for diagnostics, not calculator • Timing of measurement: 4 wks pre/4 wks post pre: 3rdwk May-June; post: 1stwk August-Sept • Timing of retrofit: July

  18. Savings Estimation • Automated calculator with true power/temperature data only Sequence of Calculations: • Compute the Normalized Annual Consumption (NAC) for pre/post data • Energy Savings Calculation Sequence • Electric Load Shape Calculation Sequence • Demand Savings Calculation Sequence

  19. Estimate of Costs • Mature case with lessons learned • Expedited approach using NOAA weather for 2 RTUs in same panel = $1250 or $635/RTU • Comprehensive approach site weather, 3 RTUs single roof = $2,450 or $817/RTU

  20. Annualized Energy Use / SavingsCalculator

  21. Next Steps • February 16, 9am-12pm RTUG follow up meeting to Feb 14 RTF review • RTF members invited to participate • Planning to make final protocol recommendation at March RTF meeting