1 / 11

D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

Status of Micromegas module(s) data taking. D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin, M. Riallot, F. Senée, Y-H Shin, S. Turnbull, R. Yonamine (Carleton, KEK, Saclay) LCTPC WP Phone Meeting #71, 26 November 2008. Large Prototype TPC Cosmic ray data

Download Presentation

D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin,

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Micromegas module(s) data taking D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, J-P Martin, M. Riallot, F. Senée, Y-H Shin, S. Turnbull, R. Yonamine (Carleton, KEK, Saclay) LCTPC WP Phone Meeting #71, 26 November 2008 • Large Prototype TPC • Cosmic ray data • First beam events • Schedule Micromegas module

  2. Large Prototype TPC Optical fiber Micromegas module

  3. Beam trigger Micromegas module

  4. Cosmic ray data • Vmesh = - 360 V = Vanode • Vcathode ~ - 12 740 V, Icathode ~ 61 μA • Gas monitoring (flow, overpressure, 02, H20) • 02~ 40 ppm, H20 ~ 20 ppm • Rate ~ 0.7 Hz using the 3 triggers • Different shaping ( 100 ns < peaking time < 2 μs) • ~ 400 000 events Micromegas module

  5. Last night cosmic ray data • Peaking time : 1 μs • Time bin : 40 ns • Gas mixture : Ar/CF4/Iso (95:3:2) Micromegas module

  6. Last night cosmic ray data Peaking time: 1 μs Micromegas module

  7. Last night cosmic ray data Peaking time: 200 ns Micromegas module

  8. First beam events • Peaking time : 1 μs Ee- = 5 GeV • Time bin : 40 ns • Gas mixture : Ar/CF4/Iso (95:3:2) Micromegas module

  9. First beam events Micromegas module

  10. TPC position for beam test ~7.7° Micromegas module

  11. Schedule • Beam available at 5:30 pm (night shift?) • Tomorrow (afternoon), replace the standard Micromegas module to resistive Micromegas Module (~ 3h) • As soon as possible, mount the safety valve and start to cool the PCMAG • First beam tests with the magnet at B = 0T and then B = 1T should be possible beginning of next week • Software analysis will continue with the help of Yun Ha Shin (Carleton) Micromegas module

More Related