EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07. IMPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07. CHARGES COLLECTED BY RLDCs DURING THE YEAR 2006-07. EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07.
E N D
EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07
IMPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07
CHARGES COLLECTED BY RLDCs DURING THE YEAR 2006-07
EXPORT OF STOA ENERGY OF SR UTILITIES DURING THE YEAR 2006-07
Growth Of Inter Regional Energy Exchanges Inter regional Power exchanges have increased manifold
UI IN SR (FOR 2006-07) • TOTAL UI TURNOVER :- 2,761 MU • TOTAL UI AMOUNT DISBURSED:- 941.5 CR • AVG WEEKLY TRANSACTION:- 52 MU • AVG WEEKLY UI AMOUNT DISBURSED:- 17.8 CR
SHORT TERM OPEN ACCESS(STOA) RATES NORTHERN REGION 594 (2.5) 928 (3.9) 667 (2.8) NORTH-EASTERN REGION NR-ER 600 (2.5) WR-NR ER-NER EASTERN REGION 620 (2.6) 370 (1.5) 647 (2.7) WR-ER WESTERN REGION 357 (1.5) WR-SR SR-ER 1311 (5.5) 1909 (8.0) SOUTHERN REGION Notes:i) The indicated STOA Rates are in Rs./MW/Day. ii) The figures shown in bracket reflect the STOA Rates in Paise/Unit. 843 (3.5) SRLDC, BANGALORE APRIL 2007
HIDE TABLE SHOW TABLE 80 Ps 45 Ps 30 Ps
AVAILABILITY TARIFF(ABT) (a)CAPACITY CHARGE (b) ENERGY CHARGE • ADJUSTMENT FOR DEVIATIONS (UI CHARGE) • = a function of Ex-bus MW availability of power plant for the day declared before the day starts x SEB’s % share. • = MWh for the day as per ex=bus drawl schedule for the SEB finalized before the day starts x Energy charge rate • =Σ(Actual energy interchange in a 15 min time block – scheduled energy interchange for the time block) x UI rate for the time block. TOTAL PAYMENT FOR THE DAY = (a) + (b)± ( c)
DAY AHEAD SCHEDULING • Schedules are made for each 15 minute time block wise on day ahead basis i.e. 96 time blocks in a day. • Participating agencies are ISGS and States. • Bilaterals/STOAs are also included in the preparation of schedules. • RLDC prepares and coordinates the schedules. • On the day of operation the schedules can be revised with prior intimation i.e. 4 to 6 time blocks.
TIME TABLE FOR EXCHANGE OF INFORMATIONIN RESPECT OF SCHEDULING
SRLDC INTER STATE GENERATING STATIONS BY 10: 00 HRS SAMPLE DC SHEET ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities Back
SRLDC BENEFICIARIES SAMPLE ENT. OF STATES BY 11: 00 HRS SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. Back
SRLDC BENEFICIARIES SAMPLE REQ. OF STATES BY 15: 00 HRS SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. Back
SRLDC SAMPLE SCHD OF ISGS BY 17: 00 HRS SAMPLE SCHD OF STATES SRLDC shall convey the net drawal schedule to each State / Beneficiary SRLDC shall convey the ex-power plant despatch schedule to each ISGS The details of unrequisitioned surpluses shall also be intimated. Back
BY 22:00 HRS ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule Back
SRLDC SAMPLE SCHD OF ISGS BY 23 00HRS SAMPLE SCHD OF STATES SRLDC shall issue the final ex-power plant despatch schedule to each ISGS SRLDC shall issue the final net drawal schedule to each State / Beneficiary Back