Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility. Introduction. Potential neutrino experiments at Fermilab; soon: Minerva and NOvA

willow
Download Presentation

Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proton Upgrades at FermilabRobert ZwaskaFermilabMarch 12, 2007Midwest Accelerator Physics Collaboration MeetingIndiana University Cyclotron Facility

  2. Introduction • Potential neutrino experiments at Fermilab; soon: Minerva and NOvA • NOvA requires proton exposure 5-10x that of current experiment (MINOS) • Additionally, studies are always underway on how to use many, many protons more neutrinos, muons, isotopes… Outline • Current Fermilab Accelerator Complex • Provides protons for antiproton and neutrino production • About 250 kW (total) @ 120 GeV • Programs to improve proton beam power • Proton Plan  underway • ANU/SNuMI  in planning • HINS (proton driver)  in R&D (not covered here…)

  3. The Main Injector Today • Provides high power, 120 GeV proton beam • 80 kW for antiproton production • 180 kW for neutrino production • Takes 6 or 7 batches from the 8 GeV Booster @ 15 Hz • 4-5 × 1012 protons per Booster batch • Total cycle time ≥ 1.4 s + batches/15 Booster NuMI (Double) Batch 1 (PBar) Batch 2 Batch 6 Main Injector Batch 3 Batch 5 Batch 4

  4. NuMI Operation • Typical beam power of 180 kW • Higher beam powers of ~ 270 kW without antiproton production • Recent Achievements: • 4.05 x 1013 protons in a pulse (exceeds design intensity) • 325 kW beam power

  5. New Beam Records • 11 batch slip stacking produces > 4 x1013 protons • Start worrying about the neutrino target • Higher intensity comes at lost efficiency • 98 -> 90% • Hope to get back to 95% • Loss management limits further advancement • Collimators, beam cleaning • Hope for operational later this year

  6. Merged bunch train in MI E 2nd Batch 1st Batch  Decelerate Accelerate Time 2nd Booster Batch 1st Booster Batch Injected into MI Slip-stacking • Merge two booster batches through RF manipulations K. Seiya et. al., PAC2003/5 • Doubles the azimuthal charge in the Main Injector • Booster loading time is doubled

  7. PROTON PLAN n • Slip stacking to NuMI in the Main Injector will gradually increase NuMI intensity to 3.7x1013 protons to NuMI per 2.2 second cycle or about 3x1020 p/yr. (~320 kW) • This will increase by ~30% as protons currently used for pbar production become available. (430 kW) • The Booster rep. rate and efficiency must increase to accommodate this

  8. Limits to Proton Intensity • Total proton rate from Proton Source (Linac+Booster): • Booster batch size • ~4-5E12 protons/batch • Booster repetition rate • 15 Hz instantaneous • Previous hardware limits: 7.5Hz average (pulsed components) • Beam loss • Damage and/or activation of Booster components • Above ground radiation • Current performance: near 1017 protons/hour recently • Total protons accelerated in Main Injector: • Maximum Main Injector load • Six “slots” for booster batches (3E13) • Up to ~11 with slip stacking (4-5E13) • Cycle time: • 1.4s + loading time (1/15s per booster batch)

  9. ANU / SNuMI • ANU: Accelerator and NuMI Upgrades for NOvA • Part of the NOvA project • Tevatron will be shutdown end of 2009 • (LHC willing) • Reuse the Recycler Ring for 700 kW • Shorten the repetition time • Same bunch charge in Main Injector • 11 or 12 batch slip-stacking • SNuMI: Super NuMI • Reuse the Accumulator for 1.2 MW • Momentum stack • Increase bunch charge by 50% • Under consideration (not part of NOvA

  10. ANU: 700 kWRecycler as an 8 GeV Proton Pre-injector • After the Collider program, use the Recycler as a proton pre-injector • Accumulate protons from the Booster while MI is running • Save 0.8 s out of 2.2 • Recycler momentum aperture is large enough to allow slip-stacking operation in Recycler, for up to 12 Booster batches injected • 4.3×1012 p/batch, 95% slip-stacking efficiency • 4.9×1013 ppp at 120 GeV every 1.333 s  700 kW • Transfer lines (2) • Kickers (many) • Injection(twice), extraction, abort, cleaning • Recycler 53 MHz RF System • 300 kV, low R/Q design • Recycler instrumentation • BPMs, dampers • Main Injector ramp time (power supplies) • Beam Loss Control

  11. Sample Timeline Booster Next Cycle Injection Orbit Recycler Slipping Orbit Previous Cycle Main Injector To NuMI 0.0 s 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 s

  12. ANU Scope: Recycler Ring Recycler Ring Modifications: Electron Cooling Insert removed Recycler Kicker Systems new elements: New Extraction Line New RR30 Straight Recycler Ring Modifications: Current Extraction Area removed Recycler Kicker Systems: New Abort Kickers • Recycler Ring Modifications • Elements removed: • Stochastic Cooling Kickers • Current Injection Area Recycler Ring Modifications Stochastic Cooling Pickups removed Recycler ring Modifications & Kicker Systems: New Injection Area Recycler ring Modifications: New 53 MHz RF

  13. SNuMI: 1.2 MWMomentum stacking in the Accumulator • After the Collider, also use the Accumulator as a proton ring • Transfer beam from Booster to Accumulator • Booster must be able to run at 15 Hz • Accumulator used for momentum stacking • momentum stack 3 Booster batches (4.6×1012 p/batch) every 200 ms • no need to cog in the Booster when injecting into the Accumulator • longitudinal emittance dilution of ~ 20% instead of a factor 3 like in slip-stacking • Box Car stack in the Recycler • load in a new Accumulator batch every 200 ms • place 6 Accumulator batches sequentially around the Recycler • Load the Main Injector in a single turn • 8.2×1013 ppp in MI every 1.333 s  1.2 MW • Requires MI RF upgrade

  14. Momentum Stacking • Beam is injected, accelerated, and debunched • Multiple injections can be brought together • Different momentum beams separated horizontally • Beam is accumulated until the momentum aperture of the Main Injector is reached • 4 injections shown – 3 planned for SNuMI • Other stacking schemes are under consideration

  15. Operating Scenarios * * * NuMI values are given for mixed-mode cycles

  16. Estimating Proton Production • Create a set of realistic operational parameters to predict future production • Monitor present accelerators • Extrapolate to future operating modes

  17. ANU/SNuMI Schedule Overview: from Steve Holmes talk 1/30/07 LIKELY NOvA TIMELINEPOSSIBLE SNuMI TIMELINE • R&D Program Goals – Timeframes

  18. NOvA- ANU: Integrated Projections • Nominal NOvA RUN: 60 x 1020 protons • ANU installations in 2009-10 and 2010-11 • Possible SNuMI installation in 2014 (rough estimate)

  19. Summary • Fermilab proton complex can be upgraded to produce a Neutrino Superbeam • 270 kW peak (180 kW ave.) available today • 430 kW upgrades are in progress • Proton Plan • 700 kW ANU upgrade for NOvA (nearing approval…) • Slip-stack in 8 GeV Storage ring • 1.2 MW SNuMI upgrade (still in early planning) • Momentum(?)-stack at 8 GeV • ≥ 2 MW beams are under still under consideration (R&D) • HINS / Proton Driver .

  20. Proton Upgrades at FermilabRobert ZwaskaFermilabMarch 12, 2007Midwest Accelerator Physics Collaboration MeetingIndiana University Cyclotron Facility