BENE interests in the CARE-Next Integrating Activity

− Three WGs at work since Spring 07. BENE interests in the CARE-Next Integrating Activity. − The present proposals of the three WGs and our interests in each of them. − Work towards the proposal (February 29). M. Meddahi V. Palladino

wilmet
Download Presentation

BENE interests in the CARE-Next Integrating Activity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. − Three WGs at work since Spring 07 BENE interests in the CARE-Next Integrating Activity − The present proposals of the three WGs and our interests in each of them − Work towards the proposal (February 29) M. Meddahi V. Palladino BENE07, 29 Oct 07 V. Palladino BENE interests in CARE-Next

  2. CARE-Next V. Palladino BENE interests in CARE-Next

  3. − 3 WGs at work since Spring 07 Today’s snapshot of CARE-Next: 4 JRA’s Joint Research Activities −The Open Meeting on our next IA proposal (OMIA, CERN Sep 10-11) − ESGARD meeting Oct 15 further definition of the content of the proposal, CrabWaist rescued identification of the general coordinators Koutschouk & Lebrun 13.5 M from EC 1/3 total effort FFAG CRAB Plus 1.5 M for NAs Networking Activities TAs Trans-national Access programs ʋ facility V. Palladino BENE interests in CARE-Next

  4. V. Palladino BENE interests in CARE-Next

  5. ESGARD meeting Oct 15 with EU HEP Directors definition of the content of the proposal:According to the most recent information from Brussells, the maximum that an IA will be allowed to get in FP7 is 15 MTherefore this amount is adopted for the IA for CARE Next too.The present proposals of the 3 working groups are being now adapted to this reduction. During the discussions the directors provided guidelines for the difficult choices to be made. 5 -0,5 – 150 = 4,350 M/WG request from EC general coordinators identifiedP. Lebrun/CERN will be general coordinator in charge after July 2008. Until then, J.P. Koutchouk/CERN will be the coordinator (deputy afterwards?). Next, end of November V. Palladino BENE interests in CARE-Next

  6. The present proposal of WG1: HIHEp& BENE ‘s interests in it JRA • R. Garoby today • Networking Activities • EURO-Lumi: ….. the network for S-LHC -NA on neutrinos: …. “BENE-Next” • Joint Research Activities • Colmat: R&D for LHC collimators ie material hardness to heat, shock and radiation. target & collection • HFM+ HTS_L: High field magnets + high temperature superconductors. • driver&acceleration&storage • and in addition • SCPL1.355 ME construction of beta=1 cavities in Saclay in the SCRF JRA. • p-driver, acceleration? • Transnational acess program • TAs CryoMagNet-TA HiRadMat: ….. access to COLMAT facility 15 M roughly 4,350 M EC V. Palladino BENE interests in CARE-Next

  7. PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS R. Garoby for R. W. Assmann, A. Ballarino, L. Bottura, G. De Rijk, M. Meddahi, V. Palladino, W. Scandale, L. Walckiers, F. Zimmermann • OUTLINE • PURPOSE & CONTEXT • CONTENT • PARTNERS • RESOURCES & SUMMARY V. Palladino BENE interests in CARE-Next

  8. Proposal of an FP7 accelerator neutrino Networking Activity The “European Strategy for Particle Physics” emphasizes the importance of accelerator-based neutrino experiments, and sets the milestone for the next major undertaking in this field in 2012: Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal neutrino program based on the information available in around 2012. A vigorous networking activity is necessary to ensure that the technical information on accelerator technologies and the scientific arguments are gathered, developed, and discussed within and outside the neutrino community. The NA intends to deliver at the end of 2012 an agreed programme of neutrino experiments, based on upgrades of existing infrastructures and/or on the proposal of a new one. Among the possibilities the following will be considered and evaluated. -Upgrade of the existing Cern to Gran Sasso facility; understanding of the ultimate upgrade potential, by combination of improved neutrino flux, neutrino spectra, flux monitoring abilities and far detector design and location. -A new neutrino facility, such as a beta-beam or a neutrino factory complex, offering much higher rate and purer flavour content, allowing a more ambitious programme of complete determination of the physical quantities governing neutrino oscillations: mass splits, flavour mixings and charge-parity violating phase. The NA will be rooted in the FP6 BENE NA, active since 2004, itself born from the ECFA Study Groups active since 1998. The existence of an organized open discussion and dissemination forum joining the EU accelerator & particle physicists active or being attracted in the sector has proven decisive over almost a decade. The European activity is embedded in an international effort; most remarkable are the yearly “NuFact” International Workshops on Neutrino Factory, Superbeam and BetaBeam“. Started in 1999 in Europe and returning every three years, it is an extremely fruitful example of collaboration of accelerator and particle physics from Europe, America and Asia.. Strengthened by FP6 support, BENE achieved the recognition in the Strategy Document of its physics case and of its plea for timely R&D. Its 3 main goals are also being delivered as promised -first progress in community building and harmonization of national projects and interests. - preliminary road map towards the scientific & technical choice of the new facility -precious collaborative studies and R&D projects now under way, soon including the FP7 EuroNu DS and the International Design Study effort. The objective of this NA represents the natural completion of this process. The NA will be able to integrate in its proposal the results of a CNGS upgrade study, of the EuroNu design study of the Neutrino Factory, Superbeam and BetaBeam options, of the state of the art, coordinated R&D that will take place in the Integrating Activity and of other R&D projects in progress. Its final proposal should be backed by the widest possible majority of the EU community active in on neutrino accelerator infrastructures worldwide, at the CNGS, at the US (NuMI) and at the upcoming Japanese (T2K) facilities. The NA funds will support participation of this community to -the IA meetings and the NA own plenary meetings and parallel workshops -the open meetings of the EuroNu DS -the yearly international “NuFact” Workshop BENE-Next V. Palladino BENE interests in CARE-Next

  9. Proposal of an FP7 accelerator neutrino Networking Activity The “European Strategy for Particle Physics” emphasizes the importance of accelerator-based neutrino experiments, andsets the milestonefor the next major undertakingin this fieldin 2012: Studies of the scientific case for future neutrino facilities and the R&D into associated technologies are required to be in a position to define the optimal neutrino program based on the information available in around 2012. A vigorous networking activity is necessaryto ensure that the technical information on accelerator technologies and the scientific arguments are gathered, developed, and discussed within and outside the neutrino community. The NA intendsto deliver at the end of 2012 an agreed programme of neutrino experiments, based on upgrades of existing infrastructures and/or on the proposal of a new one. Among the possibilitiesthe following will be considered and evaluated. -Upgrade of the existing Cern to Gran Sasso facility; understanding of the ultimate upgrade potential, by combination of improved neutrino flux, neutrino spectra, flux monitoring abilities and far detector design and location. -A new neutrino facility, such as a beta-beam or a neutrino factory complex,offering much higher rate and purer flavour content, allowing a more ambitious programme of complete determination of the physical quantities governing neutrino oscillations: mass splits, flavour mixings and charge-parity violating phase. The NA will be rooted in the FP6 BENE NA, active since 2004, itself born from the ECFA Study Groups active since 1998. The existence of an organized open discussion and dissemination forum joining the EU accelerator & particle physicists active or being attracted in the sector has proven decisive over almost a decade. The European activity is embedded in an international effort; most remarkable are the yearly “NuFact” International Workshops on Neutrino Factory, Superbeam and BetaBeam“. Started in 1999 in Europe and returning every three years, it is an extremely fruitful example of collaboration of accelerator and particle physics from Europe, America and Asia.. Strengthened by FP6 support,BENEachieved the recognition in the Strategy Document of its physics case and of its plea for timely R&D. Its3 main goals are also being delivered as promised -first progress in community building and harmonization of national projects and interests. - preliminary road map towards the scientific & technical choice of the new facility -precious collaborative studies and R&D projects now under way, soon including the FP7 EuroNu DS and the International Design Study effort. The objective of this NA represents the natural completion of this process.The NA will be able to integrate in its proposal the results of a CNGS upgrade study, of theEuroNu design study of the Neutrino Factory, Superbeam and BetaBeam options, of the state of the art, coordinated R&D that will take place inthe Integrating Activityand of other R&D projects in progress. Its final proposal should bebacked by the widest possible majority of the EUcommunity active in on neutrino accelerator infrastructures worldwide,at the CNGS, at the US (NuMI)andat the upcoming Japanese (T2K) facilities. The NA funds will support participation of this community to -the IA meetings and the NA own plenary meetings and parallel workshops -the open meetings of the EuroNu DS -the yearly international “NuFact” Workshop BENE-Next V. Palladino BENE interests in CARE-Next

  10. Proposed Second Level Work Breakdown Structure for the NA WP1 Management & coordination WP2 Getting the most of existing neutrino facilities - CNGS intensity limits - possibility of adaptation of the CNGS neutrino spectrum and of flux monitoring to physics needs (link to JRAs in FP7-IA) - Evaluation of the physics potential of upgrades WP3 Road map to the future - evaluation of the compatibility of future neutrino facilities to the accelerator upgrades in the interested European laboratories - evaluation of technological risks of the proposed options - evaluation of the synergies with other physics programs - upgrade path and flexibility - Choices of the facility(es) and proposal A more detailed breakdown is in preparation !!!!!! V. Palladino BENE interests in CARE-Next

  11. The present proposal of WG2 NCLC& BENE ‘s interests in it JRA E. Jensen Oct 26 Networking Activities Explicit support for BENE Next Joint Research Activities See later Transnational acess program Explicit support for TA-MICE 15 M roughly 4,350 M EC V. Palladino BENE interests in CARE-Next

  12. V. Palladino BENE interests in CARE-Next

  13. NC Hi Gradient RF Buncher Phase Rotation Ionisation Cooling NB Atomic level breakdown simulation To NAT (4th JRA) with last minute CRAB waist addition V. Palladino BENE interests in CARE-Next

  14. The present proposal of WG3 SCRF& BENE ‘s interests in it JRA O. Napoly Oct 26 Networking Activities As generally planned Joint Research Activities JRA1 SC RF Cavities Include SCPL 1.355 ME construction of beta=1 cavities in Saclay JRA2 Accelerator & Beam Studies JRA3 RF test infrastructore at CERN Transnational acess program As generally planned 15 M roughly acceleration in RLAs FFAGs 4,350 M EC p driver ISOL ¼ wave all our SCRF needs V. Palladino BENE interests in CARE-Next

  15. V. Palladino BENE interests in CARE-Next

  16. 3 V. Palladino BENE interests in CARE-Next

  17. The present proposal of JRA4 NAT& BENE ‘s interests in it JRA E. Jensen Oct 26 EuroFFAG …. for EMMA … Meot, Edgecock, Berg 380 KE from EC Crab Waist …. M. Biagini …. for DAFNE SHLC ? V. Palladino BENE interests in CARE-Next

  18. Conclusions Moving on with this 23 Nov WBS Schedule Cost Milestone end Nov ESGARD + Directors again 11 Jan Draft Proposal 29 Feb Submission Must write BENE-Next, EuroFFAG, TA-MICE sections grow systematically aware of how all JRAs evolve identify (create? ) & be ready to exploit their opportunities for us V. Palladino BENE interests in CARE-Next