An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tungsten Powder Jet Update Ottone Caretta STFC Rutherford Appleton Laboratory, UK 2nd Princeton-Oxford High Power Target Meeting 6-7 November-2008

  2. Tungsten Powder Jet propelled by air ~3 bar 2cm Thank you to EIP at RAL for providing the video equipment used for these experiments

  3. =3/10bar =~atm water supply 24 29 9 Rig Flow Diagram 38 44 40 To the pneumatics 6 11 16 14 27 25 17 20-21 8 10 22 26 30 2 39 28 3 5 23 31-32-33 4 1 37 36

  4. Powder Jet Rig 31st Oct 2008

  5. Powder Jet Rig 31st oct 2008

  6. Schedule November 10-18 system and control wiring November 19-27 system control development November 27-28 system commissioning November 27-christmas preliminary experiments

  7. Upgrade to ISIS target station 1 A Section AA A High temperature tungsten pellets Helium cooling 800MeV, 160kW, 50Hz 90kW heat removed in water Section view of current target Section view of target concept Target being in pellet form allows high temp operation without high stresses No cooling water to moderate neutron flux Scope for more than 160kW? Ref: Sievers 2003.

  8. NF-IDS and EUROnu Targets Work Program (30 months) • NF-IDS primarily focused on baseline recirculating mercury target • With input of EUROnu task broadened to include alternative tecnologies (solid & flowing powder targets) • Must achieve cost estimate of target system so implies target selection • Selection criteria for choice of target • Work Program • First meeting 15th to 17th December 08 at CERN • Comments on proposed selection criteria and work program are welcomed.