1 / 33

Republic Polytechnic Expansion & SIT Campus Building

Republic Polytechnic Expansion & SIT Campus Building. Green Mark Platinum Pre-Assessment. Project Team. Site Plan. N. RP EXPANSION 11,000m². SIT BUILDING 13,000m². Perspective. SIT Building 13,000m² 9 Storeys. RP Expansion 11,000m² 5 Storeys. Sectional Perspective – East.

wiltse
Download Presentation

Republic Polytechnic Expansion & SIT Campus Building

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Republic Polytechnic Expansion & SIT Campus Building Green Mark Platinum Pre-Assessment

  2. Project Team

  3. Site Plan N RP EXPANSION 11,000m² SIT BUILDING 13,000m²

  4. Perspective SIT Building 13,000m² 9 Storeys RP Expansion 11,000m² 5 Storeys

  5. Sectional Perspective – East SIT Building 13,000m² 9 Storeys RP Expansion 11,000m² 5 Storeys

  6. Sectional Perspective – West SIT Building 13,000m² 9 Storeys RP Expansion 11,000m² 5 Storeys

  7. Part 1: Energy EfficiencyNRB 1-1 Thermal Performance of Building Envelope – ETTV Building Orientation: Overall Window Wall Ratio: Double-Glazed Vision and Clerestory Glasses Shading Coefficient: 0.29 U-Value: 1.6W/m².K North-South (RP) North East-South West (SIT) 44% (RP) 64% (SIT)

  8. Part 1: Energy EfficiencyNRB 1-2 Air-Conditioning System

  9. Part 1: Energy EfficiencyNRB 1-2 Air-Conditioning System

  10. Part 1: Energy EfficiencyNRB 1-5 Daylighting SIT Atrium 22nd Dec 1:00pm, Sunny Sky

  11. Part 1: Energy EfficiencyNRB 1-6 Artificial Lighting

  12. Part 1: Energy EfficiencyNRB 1-6 Artificial Lighting

  13. Part 1: Energy EfficiencyNRB 1-8 Ventilation in Common Areas

  14. Part 1: Energy EfficiencyNRB 1-9 Lifts and Escalators

  15. Part 1: Energy EfficiencyNRB 1-10 Energy Efficient Practices & Features

  16. Part 2: Water EfficiencyNRB 2-1 Water Efficient Fittings

  17. Part 2: Water EfficiencyNRB 2-2 Water Usage and Leak Detection

  18. Part 2: Water EfficiencyNRB 2-4 Water Consumption of Cooling Tower

  19. Part 3: Environmental ProtectionNRB 3-1 Sustainable Construction

  20. Part 3: Environmental ProtectionNRB 3-2 Sustainable Products

  21. Part 3: Environmental ProtectionNRB 3-3 Greenery Provision

  22. Part 3: Environmental ProtectionNRB 3-4 Environmental Management Practice

  23. Part 3: Environmental ProtectionNRB 3-5 Green Transport

  24. Part 3: Environmental ProtectionNRB 3-6 Refrigerants

  25. Part 4: Indoor Environmental QualityNRB 4-1 Thermal Comfort

  26. Part 4: Indoor Environmental QualityNRB 4-2 Noise Level

  27. Part 4: Indoor Environmental QualityNRB 4-3 Indoor Air Pollutants

  28. Part 4: Indoor Environmental QualityNRB 4-4 Indoor Air Quality Management

  29. Part 4: Indoor Environmental QualityNRB 4-5 High Frequency Ballast

  30. Part 5: Other Green FeaturesNRB 5-1 Innovations

  31. Summary of Green Mark Points

More Related