1 / 6

Agenda

Stay up to date with the latest safety measures and scheduling updates for machine and system reports. Join the next time meeting on Jan 12th, 2010!

windoma
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • Safety • Schedule • Machine and system reports G. Robert-Demolaize, Time Meeting

  2. Safety and training • Safety: Ed Lessard G. Robert-Demolaize, Time Meeting

  3. Schedule • Since 12/31/2009, 23:56: RHIC is in Physics production mode. • Physics store (as of 1/5): 68x68, 0.9x109 Au/bunch, ~95% efficiency. • Stochastic Cooling commissioning started, still some work on LLRF. • First pre-APEX session on 1/6 (4 to 6 hours long), first maintenance day on 1/13. G. Robert-Demolaize, Time Meeting

  4. Machine and system reports • RHIC Kevin Brown • STAR Bill Christie • PHENIX Stefan Bathe • APEX Fulvia Pilat G. Robert-Demolaize, Time Meeting

  5. Machine and system reports • Maintenance Paul Sampson • Operations Peter Ingrassia G. Robert-Demolaize, Time Meeting

  6. Next Time meeting • Next Time meeting: Jan. 12th, 2010 !! G. Robert-Demolaize, Time Meeting

More Related