40 likes | 158 Views
08:00 Meeting. Schedule Meeting 08:30 Tuesday morning to determine if new version TEM/TEM-PS should be tested on EM system (as early as Tuesday) Testing/Data Taking performed 12-hrs/day since EM system integration on Thursday Shifts summary:. EM System Optimization Checks. Rates summary:
E N D
08:00 Meeting Schedule • Meeting 08:30 Tuesday morning to determine if new version TEM/TEM-PS should be tested on EM system (as early as Tuesday) • Testing/Data Taking performed 12-hrs/day since EM system integration on Thursday • Shifts summary:
EM System Optimization Checks Rates summary: TKR trigger only – 10 Hz CAL trigger only – 30 Hz TKR or CAL trigger – 35 Hz External trigger – 3 Hz Nominal Configuration: TKR or CAL trigger Non zero-suppressed FITS data output TOT disabled TKR Threshold = 30 CAL LE Gain = 5 CAL HE Gain = 13 TKR delay = 0 CAL delay = 70 External Trigger: TKR delay = 35 CAL delay = 80
Benchmarks for TEM/TEM-PS test • TKR: Occupancy vs strip (6 graphs, 1 per layer) • TKR: Gain vs strip (6 graphs, 1 per layer) • TKR: Noise vs strip (6 graphs, 1 per layer) • CAL: Pedestal vs CDE end (4 graphs, 1 per range) • CAL: Noise vs CDE end (4 graphs, 1 per range) Review these graphs at 4:00pm meeting today in preparation for 8:30am meeting tomorrow morning. Today’s activities will be preparation of these graphs; otherwise, take more data with external trigger, and find optimum CAL delay for TKR trigger only, i.e. CAL slow shaper is 3.7 microsec time-to-peak, then subtract TKR time-to-trigger (2.0 microsec).
Shift Schedule Until End of Data Taking • Two shift workers is necessary and adequate • Need to assign shifts until October 12 • Shift schedule proposal to be presented today at 4:00pm meeting