An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Home Complete Best Practice Renovation Blueprint BLUEPRINT MAP KEY Action A task or activity that needs to be completed in the INITIAL PREPARATION Action A start node that indicates where to begin the map A task or activity that needs to be completed in the DISCOVERY PHASE Start A task or activity that needs to be completed in the DESIGN PHASE Action Indicates the direction of flow from one speedmap to another 2014 Edition A task or activity that needs to be completed in the CONSTRUCTION PHASE A decision point where the map user must make Action Decision required An end node that indicates where to end the process map A task or activity that needs to be completed in the BUILDING PHASE Action Schedule a 30 minute renovation coaching call

  2. Best Practice Renovation Blueprint Initial Preparation Discovery Phase 3. Select architect for ‘Discovery Process 2. Complete planning worksheet 4. Identify legal restrictions 5. Identify physical site restrictions • Decide • to start Available for download fromYOURWEBSITE Zoning review, preliminary building code review, survey Survey site size, geographical restrictions, tree issues 6. Develop brief with architect Building code report, construction drawings, schedules, specifications N N Y 9. Concept drawings Y 11. Consent process 2014 Edition 8. Select design architect 10. Proceed? 7. Proceed? Design Phase 12. Construction documentation Construction Phase 13. Tender document preparation 14. Select construction team with your architect 16. Home Complete 15. Build Schedule a 30 minute renovation coaching call

  3. Beginners Guide To Resource & Building Consent Process BLUEPRINT MAP KEY A task or activity that needs to be completed in the GETTING IDEAS TOGETHER PHASE ACTION ACTION A task or activity that needs to be completed in the RESOURCE CONSENT PHASE Action A task or activity that needs to be completed in the BUILDING CONSENT PROCESS Indicates the direction of flow from one speedmap to another 2014 Edition A task or activity that needs to be completed in the COMPLETION PHASE Action A decision point where the map user must make Decision required A task or activity that needs to be completed in the ONGOING COMPLIANCE PHASE Action Schedule a 30 minute renovation coaching call

  4. Beginners Guide To Resource & Building Consent Process Getting ideas together 11. Consent process 11.1.. Engage architect 11.2. Preliminary design 11.3. Get a project information memorandum 11.4. Confirm consent process 11.5. Prepare assessment of environmental impacts If you don’t need resource consent go to step 8 Building Consent process 11.9. Apply for building design 11.8 Final design Resource consent received & compliance with conditions 11.7.Apply for resource consent 11.6. Seek written approval from affected parties Melbourne Edition Resource Consent process Building consent received & compliance with conditions Completing your project 11.13. Get a code compliance certificate 11.14. Ensure ongoing compliance 11.10. Engage builder and start construction 11.11.Ensure inspections are carried out 11.12. Building is complete Schedule a 30 minute renovation coaching call

  5. Cost of change Project Discovery Brief Concept Design Technical Design Construction Risk Not here Make design changes here Complete Opportunity for change Time Schedule a 30 minute renovation coaching call