1 / 27

Real Time GPS Tracking System MSE Project Phase I Presentation

Real Time GPS Tracking System MSE Project Phase I Presentation. CIS 895. Bakor Kamal. Outlines. Project Overview Requirements Project Plan Cost Estimation Software Quality Assurance Plan Architecture Elaboration Plan Standards, Practices, Conventions, and Metrics Project Deliverables

wmyoung
Download Presentation

Real Time GPS Tracking System MSE Project Phase I Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Real Time GPS Tracking SystemMSE ProjectPhase I Presentation CIS 895 Bakor Kamal

  2. Outlines • Project Overview • Requirements • Project Plan • Cost Estimation • Software Quality Assurance Plan • Architecture Elaboration Plan • Standards, Practices, Conventions, and Metrics • Project Deliverables • Questions Department of Computing and Information Sciences - Kansas State University

  3. Project Overview • Goal: • To develop an application for tracking mobile devices which came with GPS functionality with it. • Motivation: • The motivation of developing this project has been my desire of learning more about Mobile programming technology. Moreover, I want to apply what I learned about development lifecycle. Department of Computing and Information Sciences - Kansas State University

  4. Project Overview (Cont.) Department of Computing and Information Sciences - Kansas State University

  5. Requirements Department of Computing and Information Sciences - Kansas State University

  6. Requirements (Cont.) • Track Connected Devices. • Purpose: The user can see a list of connected devices that are associated with his user ID. • Input: User credential. • Output: information about the connected devices and links that takes the user to more details and statistics about the devise position. Department of Computing and Information Sciences - Kansas State University

  7. Requirements (Cont.) • View Statistics • Purpose: To let the user to see some statistics about the user position such as the average speed of the device movements, the path of the device moves and how many miles that device moved. • Input: Device ID. • Output: Mentioned statistics and information. Department of Computing and Information Sciences - Kansas State University

  8. Requirements (Cont.) • Register Device • Purpose: to allow the user to add a new device under his account. • Input: Device type and device description. • Output: when the user successfully adds the device he will see “New Device Added Successfully” statement. Department of Computing and Information Sciences - Kansas State University

  9. Requirements (Cont.) • Contact the System Administrator • Purpose: To provide a form for contacting the system admin to help the user in installing the client application in the device and to answer any questions regarding the system and to provide feedback. • Managing Accounts • Purpose: To give the user the ability to update his information including devices description, some of the tracking options, and his username and password. Department of Computing and Information Sciences - Kansas State University

  10. Requirements (Cont.) • Signup • Login Department of Computing and Information Sciences - Kansas State University

  11. Project Plan Department of Computing and Information Sciences - Kansas State University

  12. Cost Estimate • Basic COCOMO Model • This project “Real Time GPS Tracking System” is an average complexity, thus it is classified as the first class of the COCOMO model the Organic Projects. Following is the formula for the cost estimation for the COCOMO Organic projects: • Effort = 3.2*EAF (Size)^1.05 • Time (in months) = 2.5(Effort)^0.38 Department of Computing and Information Sciences - Kansas State University

  13. Effort Adjustment Factor I classified the adjustment factors in the following way: • Computer turnaround time as low and a value of 0.9 • Analyst capability as high and a value of 1.1 • Applications experience as normal and a value of 1.0 • Programmer capability as normal and a value of 1.0 • Virtual machine experience as normal and a value of 1.0 • Language experience as normal and a value of 1.0 • Use of modern practices as normal and a value of 0.82 • Use of software tools as high and a value of 0.83 • Required development schedule as normal and a value of 1.10 Department of Computing and Information Sciences - Kansas State University

  14. Effort Adjustment Factor (Cont.) I classified the adjustment factors in the following way: • Required reliability as low and a value of 1.0. • Database size as low and a value of 1.0 • Product complexity as normal and a value of 1.08 • Execution time constraint as normal and a value of 1.2 • Main storage constraint as low and a value of 1.1 • Virtual machine volatility as low and a value of 0.95 • Computer turnaround time as low and a value of 0.9 Department of Computing and Information Sciences - Kansas State University

  15. Calculations • The EAF value evaluated to 0.9. I estimated the size to be 2000 LOC based on the current prototype. The effort evaluates to: • Effort = 3.2*0.9*2.0^1.05 = 5.9 staff months • The time can now be calculated as: • Time = 2.5*5.9^0.38 = 4.9months Department of Computing and Information Sciences - Kansas State University

  16. Architecture Elaboration Plan (phase2) • Revision of Vision Document: • After the first presentation, changes as required by the committee should be made in the Vision Document. • Revision of Project Plan: • According to the changes suggested by the committee after the first presentation, the project plan should be modified to include those changes. A section about the implementation plan should be added before the second presentation. • Architecture Design: • Based on the use case diagram in the vision document, an architecture design should be developed for the second phase. • Development of Prototype: • This prototype will include the demonstration of the critical requirements identified in the Vision Document. Department of Computing and Information Sciences - Kansas State University

  17. Architecture Elaboration Plan (Cont.) • Test Plan: • A complete test plan will be developed indicating the testing techniques used and the way bugs will be reported and solved. This will be done to test whether all the requirements specified in the vision document are met or not. • Formal Technical Inspection: • Loai Zomlot and Waleed Al-Jandal will review the architecture design produced by the developer and submit a report on their findings. Department of Computing and Information Sciences - Kansas State University

  18. Software Quality Assurance Plan • Reference Documents • Vision Document • Project Plan • IEEE Guide for Software Quality Assurance Planning • IEEE Standard for Software Quality Assurance Planning • Supervisory Committee • Dr. Daniel Andresen (Major Professor) • Dr. Gurdip Singh • Dr. Mitchell Neilsen • Developer • Bakor Kamal • Formal Technical Inspectors • Loai Zomlot • Waleed AlJandal Department of Computing and Information Sciences - Kansas State University

  19. Documentation • The documentation will consist of a vision document, project plan, software quality assurance plan, formal requirements specification, architecture design, test plan, formal technical inspection, prototype, user manual, component design, source code, assessment evaluation, project evaluation, references, formal technical inspection letters. • All documentation will be posted on the developer’s web site at: http://people.cis.ksu.edu/~bakor/courses/MSE/default.htm Department of Computing and Information Sciences - Kansas State University

  20. Standards, Practices, Conventions, and Metrics • Documentation Standard • IEEE standards will be used as a guideline to follow. • Coding Standard • The project will use traditional object oriented analysis and design methods. Recommended Java style guidelines will also be followed. • Documentation • JavaDoc will be used for documenting the complete API for the project. • Metrics • Basic COCOMO will be used to estimate the effort and time for the project. Department of Computing and Information Sciences - Kansas State University

  21. Tools, Techniques, and Methodologies • The proposed software for this system was • Java ME (Java Platform, Micro Edition). • Eclipse – as the IDE for J2ME • PHP • Ajax • Dreamweaver – as IDE for PHP and Ajax • MySQL DB • Microsoft Software Project 2007 – Project Planning • OpenJMS – to implement JMS PTP (between the GPS client and the server) • PTP will be used because the nature of this application considered as 1:1 application that is we have only one publisher and one subscriber all the time Department of Computing and Information Sciences - Kansas State University

  22. Others Media Control • The software will be available on a CD-ROM ready for installation. The executable file will be recorded on it. • A user manual soft copy will also be saved in the CD to aid with the installation process and use of the software. • Documentation will be available from the developer’s website http://people.cis.ksu.edu/~bakor/courses/MSE/default.htm Records collection, maintenance and retention • The design documentation will be stored in the University library, the Major Professor and the developer. • Entire source code, documentation and web pages for the project website will be submitted to the Major Professor in the form of a CD. This will also be stored with the developer. Department of Computing and Information Sciences - Kansas State University

  23. Project Deliverables • Phase I: • Vision Document 1.0 • Project Plan 1.0 • Software Quality Assurance Plan 1.0 • Presentation I Department of Computing and Information Sciences - Kansas State University

  24. Project Deliverables (Cont.) • Phase II • Action items identified during Phase I • Vision Document 2.0 • Project Plan 2.0 • Formal Requirements Specification • Architecture Design • Test Plan • Formal Technical Inspection- by two MSE Students • Executable Architecture Prototype • Presentation II Department of Computing and Information Sciences - Kansas State University

  25. Project Deliverables (Cont.) • Phase III • Action items identified during Phase II • User Manual • Component Design • Source Code • Assessment Evaluation • Project Evaluation • Test Results • References • Formal Technical Inspection- by two MSE students • Presentation III Department of Computing and Information Sciences - Kansas State University

  26. Project Address • Project Address: • http://people.cis.ksu.edu/~bakor/MSEProject/ • Documentation Address: • http://people.cis.ksu.edu/~bakor/courses/MSE/default.htm Department of Computing and Information Sciences - Kansas State University

  27. Questions Department of Computing and Information Sciences - Kansas State University