1 / 1

consensus on goals: science competitive edge of LUCIFER MOS

consensus on goals: science competitive edge of LUCIFER MOS we want a reliable system with low risks prompt realization of GLAO upgrade path to on-axis diffraction limited performance needs to be identified

wray
Download Presentation

consensus on goals: science competitive edge of LUCIFER MOS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. consensus on goals: • science competitive edge of LUCIFER MOS • we want a reliable system with low risks • prompt realization of GLAO • upgrade path to on-axis diffraction limited performance • needs to be identified • upgrade path to wide-field, modest Strehl, diffraction limited operations • needs to be identified • consensus on technology: • the lowest risk/affordable choice for GLAO in terms of laser technology • at present is a pulsed Rayleigh system • projection system should be independent of laser technology, be a single • projector for each of the pupils and use simple reflective/lens optics, • allowing both on-axis and off-axis projection schemes • wave front sensors should not require immediate re-design of AGW units: this may require that the wfs are outside the AGW units • identify wfs detectors and suitability of pockel cells • unknowns: • which is the best upgrade path ? • benefit of LGSF to interferometry (given fringe tracking issues) • how fast will a low cost, 3rd generation Na-laser be available commercially? • impact of LGSF on operations & commissioning

More Related