An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nuclear Program in Czech Republic Marek Tengler (IEEE SC2, Gothenburg) (15-17th June, 2011)

  2. Nuclear progam in Czech Republic Temelín NPP (utility ČEZ) PWR plant type VVER 1000 model V-320 - Basic Design: Russia - Detail Design: Czech (Skoda, EGP..) - Two units with design electric power output 1000 MWe, each - Completed in years 2000-2002 - Design Lifetime: 40 year (+20) In present cover 14% of all electricity production in Czech Republic Peculiarity:Russian design equipped by US WELCO I&C system licensed in accordance US NRC requirements 1. Nuclear Power Plants in Czech 2

  3. Nuclear progam in Czech Republic Dukovany NPP (utility ČEZ) PWR plant type VVER 440 model V-213 - Four units with original design electric power output 440 MWe, each - Completed in years 1985-1987 - Design Lifetime: 30 year (+30) In present cover 20% of all electricity production in Czech Republic Peculiarity: Modernization projects in years 2005-2009 encreasing the safety and electric output 3×460 MWe and 1× 500 MWe 1. Nuclear Power Plants in Czech(cntd.) 3

  4. Nuclear progam in Czech Republic 2. Future nuclear projects Dukovany NPP planed construction Unit 5 (PWR) Temelín NPP planed construction Unit 3 and 4 (PWR) Jaslovske Bohunice planed construction 1 or 2 new unit (PWR) 4

  5. Nuclear progam in Czech Republic Preparatory analysis • EIA is performed • Network connection study • Heavy component transportation study • Raw water colleaction study Biding process begun (2009/2010) • Biding process run in accordance of Czech/EU rules • Qualification of bidders proceed (3 companies / 3 projects) QA Program submitted to State regulatory authority (SÚJB) EIA submitted to Ministry for environment 3. New Nuclear Projects – actual status 5

  6. Nuclear progam in Czech Republic Supplier Project 6

  7. Nuclear progam in Czech Republic 7

  8. Nuclear progam in Czech Republic 8