An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brownfields in UK and Czech RepublicAn Engineer’s Experience Dr. Martin Duris Presentation for COBRAMAN Training Programme 5th Training, 21st – 22nd September 2010

  2. Introduction • PBA – Engineering Consultancy • 500 staff in total • 400 staff in UK, 100 overseas • Prague Office since 1999 • Brownfields Regeneration and Land Development are the main business areas • HQ located in Reading, former industrial centre in SE England

  3. Reading • History – industrial city: brewing, biscuits (Huntley and Palmers), bulbs, bricks • Dull, undesirable place to live in or visit

  4. Reading • Regeneration over the past 20 years has changed Reading out of recognition • Production changed to high tech IT companies (Microsoft, Oracle) with offices in the centre, leading to pedestrianisation • Huntley & Palmers demolished, just one building left

  5. Reading • City centre regeneration included construction of a major shopping centre – The Oracle

  6. Reading • New business was also attracted with extensive regeneration of edge of town sites: - Thames Valley Park, former coal- fired power station - Green Park, former landfill & other low grade land - Madejski Stadium, former landfill, now home to a Premierships team

  7. Reading

  8. Reading

  9. Reading • Reading is now one of the top SE destinations for retail (The Oracle Centre) • The Reading area is one of the best performing regions in the country • It has become a desirable destination

  10. Prague & Czech Republic • Has not benefitted from the post-WWII growth as UK • Many old factories, dilapidated industrial estates • Poor maintenance, poor quality of construction, heavy pollution • Sometimes arrogant decision-making by the ruling party left big scars • Proper regeneration activities started only 10 to 15 years ago • Issues identical to UK, but delayed, some issues more prominent, lack of public funds

  11. Prague • Zizkov Cargo Station redevelopment • Former cargo station, full of old tracks, buildings and contamination • Massive size – 55 ha • Two private developers – Discovery and Sekyra Group • Discovery – northern part, 30 ha, 1st phase 6 ha • Future uses – residential, office, retail (300m x 120m), hotel • Project value CZK 6 billion

  12. Zizkov Cargo Station

  13. Zizkov Cargo Station

  14. Zizkov Cargo Station

  15. Prague • Laser Centre Dolni Brezany • ELI – Extreme Light Infrastructure (laser) • Former wood processing plant • Site 8 ha, buildings 35,000 m2 • EU-funded, supported by Ministry of Education & Institute of Physics of the Czech Academy of Sciences • Four buildings: laser hall, labs, offices, lecture halls, library, gallery • Project value CZK 1 billion

  16. ELI Laser Centre

  17. ELI Laser Centre

  18. Engineer’s role • Developments can be Engineer - led • Green Park – PBA were approached by the landowner 25 years ago for advice on how to develop the land • Opportunities identified, PBA approached Prudential as a potential investor • Green Park has become one of Pru’s flagship projects • Same story with Thames Valley Park • PBA still look to introduce potential investors to land that needs another use (quarries, landfill sites, etc)

  19. Brownfield vs. Greenfield • Often high clean-up costs, public funding often necessary (gas works, heavy metal manufacturing particularly onerous) • Service diversions and tight access frequent issues • Advantages in town centre – connectivity to public transport and well served by the utilities • Greater attention now given to retain & restore industrial buildings – more sustainable, retains character of the site • Greater emphasis placed on retaining or establishing communities through mixed use developments, even business parks • Some recent redevelopments were too sweeping, removed character & critically damaged or destroyed communities

  20. Image & Wealth • Regeneration stimulates growth, but: • Needs to be supported by local availability of skills • Businesses need to be willing to relocate and/or expand (attractive image) • New communities must be created • Mix of old character and new imaginative landscaping • Public money needed for clean-up