IMPLEMENTACIÓN MILLER EN EMBARCADERO 41

IMPLEMENTACIÓN MILLER EN EMBARCADERO 41. Zona Barra ; Se retiró toda la implementación anterior y se hicieron los siguientes cambios: Reconstrucción de 02 barras completas. Instalación general de vinil sobre congeladoras Construcción de techo e iluminación de barra.

wyman
Download Presentation

IMPLEMENTACIÓN MILLER EN EMBARCADERO 41

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IMPLEMENTACIÓN MILLER EN EMBARCADERO 41

  2. Zona Barra; Se retiró toda la implementación anterior y se hicieron los siguientes cambios: • Reconstrucción de 02 barras completas. • Instalación general de vinil sobre congeladoras • Construcción de techo e iluminación de barra. • Construcción de enrejado en laterales y sobre congeladoras. • Reconstrucción de barra con acabado en Micro cemento en tablero y faldón. • Instalación de botellas en cornisa e iluminación de la visibilidad. • Construcción e instalación de Backlight de 02 barras.

  3. Zona Torre Bailarinas; Se retiró toda la implementación anterior y se hicieron los siguientes cambios: • Instalación de vinil superior e inferior en 02 torres centrales del local. • Mantenimiento de iluminación de las 02 torres centrales • Implementación de techo iluminación baja de torres centrales.

  4. ANTES

  5. DESPUES