AirBase developments and EoI2005 reporting cycle Patrick van Hooydonk and Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC) under contract to the European Environment Agency Bilthoven, The Netherlands. Contents. AirBase developments 2004/2005/2006 (Wim)
E N D
AirBase developments and EoI2005 reporting cycle Patrick van Hooydonk and Wim Mol European Topic Centre on Air and Climate Change (ETC/ACC) under contract to the European Environment Agency Bilthoven, The Netherlands
Contents • AirBase developments 2004/2005/2006 (Wim) • EoI2005 reporting cycle (Patrick) 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2004/2005 > DEMv8.0 • Moving/Copying stations from one network to another • Measurement methods: • Automatic analyzer (fixed list of meas.methods) • Remote sensor (fixed list of meas.methods) • Active sampler • Export: all meta data info (DEM meta info file) • Import: modify, delete, add meta information networks, stations and measurement configurations 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2004/2005 > DEMv8.1/8.2 • Bugs during the workshop 9-10 June Copenhagen • Bugs in visualisation and report module • Patches available medio August and 1 Sept. 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2004/2005 > Workshop 9-10 June at EEA • DEM training • 37 participants from 31 MS • Valuable experience not only to the participants but also to ETC/ACC! • The first time that the DEM was tested by so many people! 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2004/2005 > QA/QC • See “QA/QC checks on air quality data in AirBase and on the EoI2004 data” (link: http://air-climate.eionet.eu.int/reports) • Removal of phantom stations • 1079 stations removed • 1954 left: 1549 will be removed asap; 405 will be populated with data • Overview PM10 correction factors used in the 2002-data (+ recently overview 2003-data) • EoI2004 quality checks. 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2004/2005 > cycle 2004/2005 Date Process DS Process ETC/ACC 1-6-04 Release DEMv7 Modify, check metadata Import, check raw data Submit to CIRCA 1-10-04 Upload DEM into AirBase Quality checks + reports Replies on feedback reports 15-1-05 Additional feedback Processing (non) replies 1-3-05 Calculation statistics and exceedances 1-4-05 Release of AirBase with EoI data + XML dumps 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 • See report “AirBase – potentials and developments” also in http://air-climate.eionet.eu.int/reports • Items: • Improving the quality • Accessibility • Completeness • Central database for AQ meta information • Coupling with geographical data • Reportnet • Accellerating data transmission cycle 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Improving the quality • Outliers checks before 2002 • Filling time gaps 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Coupling with geographical data • Station coordinates -> NUTS codes • NUTS codes: NUTS1, NUTS2, NUTS3, LAU1 and LAU2 • NUTS codes -> Zones and agglomerations • DEMv9: NUTS4, NUTS5 replaced by LAU1, LAU2 • DEMv9 will be preloaded with the new NUTS codes for checking by the data suppliers 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Central database for AQ meta information • Merging the FWD with the EoI (see Andrej Kobe: Data Exchange Group) • Extend AirBase with information on zones and agglomerations (see Frank de Leeuw : revised AQ Information System) 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Completeness • Correct information on the measuring method used including the correction factors PM10 • Extension AirBase/DEM with precipation data (4DD) 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Accessibility • AirView 3.1 • XML dumps (+ ascii files with raw data) • Excel macros for postprocessing XML dumps • New: migration of the visualisation and dissemination functions of AirBase from ETC/ACC to EEA • In 2008 the new EEA system is operational • At least same functionality as AirView and XML dumps/Excel macros • Integration with EEA data and map service • Generation of reports (tables in the EoI Technical report) • ….. 10th Eionet Workshop on Air Quality Okt 17-18 2005
AirBase dev. 2005/2006 > Accelerating data transmission cycle • AirBase uploaded, quality checked, statistics, exceedances: • 2004/2005: After 6 months (1 April) • 2005/2006: After 4 months (1 Februari) • 2006/2007: After 3 months (1 January) on condition that: • MS deliver feedback replies within a month • All MS deliver the DEM • Earlier availability of statistics is possible: • Release of the DEM in April/May • MS deliver the DEM as soon as the national validated data are available • Advance the 1 Oktober deadline 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle • Status • Upload procedure • Time shedule 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: Status Status upload-process: 14 oct. 2005 Number of county reports expected: 33 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure • Changes country feedbacks • Availability 2004-data in AirBase 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure - country feedback • Reply expected in two ways: • Modified country feedback-sheets • DEM-database • Changes country feedback: • Sheets adjusted for automatic processing reply of: • Changes outlier check boundaries • Detected outliers • Updating essential meta data • Confirm deletions/resubmissions 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure - country feedback Fill in new boundary values Example 1 : outliers(overview) 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure - country feedback If status = C: correct result value Example 2 : outliers(results-detail) Update status value 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure - country feedback Example 3 : missing meta(classification) Fill in missing meta information 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: upload procedure - availability Preliminary state of AirBase at 1st of december will be available on the 15th of december: 10th Eionet Workshop on Air Quality Okt 17-18 2005
EoI 2005 reporting cycle: Time schedule 10th Eionet Workshop on Air Quality Okt 17-18 2005