An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DesignWell Architects“Designing for you and for the future” Alyssa Stroh, AIA Principal/Founder 777 8th Ave E Fargo, ND 58105 (701)234-5678 designwellarch@wordpress.com

  2. Request Response Monsieur Georges UNTELEntreprise fictive46, rue Jenesaisquoi12345 UNEVILLE Request for Proposal: Designed space in response to growing need for more amenities in 11th Arrondissement, Paris, France.

  3. Defining the problem • Excessive nightlife • Attracted crowds • Vacant during daytime

  4. Solution • Bookstore • Small bistro • Seating • Performance space • Reasoning • Audience • Social • Environment • Hours

  5. Location is Key • Corner of Oberkampf St. and Boulevard Voltaire • Next to Biocoop • Privacy 11tharrodisement Figure 1: Map of arrondissements in Paris, France Figure 2: Map showing corner of Oberkampf & Buolevard Voltaire Figure 3: Biocoop store in Paris

  6. Building Design • One floor - 305sq m • Small interior space • Exterior space

  7. Schedule Proposal • Pre-construction – 2 months • May – June 2012 • Meet with client • Revamp design to meet client needs • Finalize design • Decide on construction team • Construction – 4 months, 2 wks • July – early Dec. 2012 • Site contract & Demolition • Construction • Interior • Business Total design & construction time estimation: 6 months, 2 weeks May 2012 – Dec. 2012

  8. Budget Proposal • Renovation Costs € 7643 • Construction Costs € 3057.20 • Consultants’ Fees/Legal Fees € 382.51 • Architectural/Engineering Fees € 611. 44 • Equipment for Bistro € 3821.50 • Furniture € 2292.90 • Books and supplies € 3057.2 • Office supplies € 230.00 • Total € 21,000