An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Real Solution Industrializing the Building Construction Process Dr. Mohamed Al-Hussein Email: malhussein@ualberta.ca

  2. Residential Construction Material Waste Minimization (by volume)

  3. EMISSIONS ANALYSIS: ON-SITE CONSTRUCTION CO2 EMISSION 23%

  4. 24kg of CO2 per kg of manufactured drywall1 8.64MJ/Kg of manufactured drywall2 0.76 kg CO2/sf of manufactured drywall3

  5. The cost of weather protection & scaffolding Building 4-times

  6. Replacing 7-Studnet dorms bungalows With 5- each is 3-story in one summer The challenge is how to assemble on site these 5 3-story each in 10-working days

  7. June 15

  8. Other level of industrialization & its Application

  9. Today’s Technical Challenges Drafting For Manufacturing (DFM) Lean Manufacturing BIM Modeling Beyond BIM Supporting Tools

  10. Industrialization creates new requirements for design Current Drafting software Does NOT support the manufacturing

  11. ALGORITHM ANALYSIS: FRAMEX 45,000 + lines of Code • Floor plan • 3D Model

  12. CUTEX: 2D-OPTIMIZATION Cutting pattern Possible cuts Non-Guillotine cutting Cutting pattern vector Waste Gilmore-Gomory Guillotine cutting Sheets Residual

  13. CUTEX: 2D-OPTIMIZATION (CON) Waste : 2.4%

  14. Beyond BIM: Lifting Scenario Scenario 1 Kullman Arrangement one building @ a time (1-Building in 2- days) -Background Color –one day of operation -Box – module number, sequence, Advance-Present -A, B, B1 – spots for module lifting -PB1 – place building 1

  15. What is happening in Europe