Why we need to learn a second language?

Why we need to learn a second language?. Because it’s a “ruff” world out there. MIAMI HARBOR CHANNEL, MIAMI, FLORIDA Harbor Blasting and Lessons Learned. Presented by: Luis “Rene” Perez, P.E. Senior Project Manager and Terri Jordan Biologist. Presentation. Project Overview

xaria
Download Presentation

Why we need to learn a second language?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Why we need to learn a secondlanguage? Because it’s a “ruff” world out there

  2. MIAMI HARBOR CHANNEL, MIAMI, FLORIDA Harbor Blasting and Lessons Learned Presented by: Luis “Rene” Perez, P.E. Senior Project Manager and Terri Jordan Biologist

  3. Presentation • Project Overview • Port Expansion – A Successful Coordination

  4. Port of Miami Cargo Gateway of the Americas and Cruise Capital of the World

  5. Cargo • Largest Container Port in Florida, 5th on the east coast and 12th in the nation • In FY05, it surpassed the 1 million TEU mark and 9 million total tons, three years in a row • Largest import trading region is Europe with 2.09 million tons of trade • Largest export trading region is South America with 2.2 million tons • Other top trading countries are China, Honduras, Hong Kong, Brazil and Italy • Maritime partners call in more than 100 countries and 250 ports around the globe

  6. Cruise • Cruise Capital of the World • Welcomed 3.6 million passengers in 2005 • More mega-ships (200+) than any other port in the world • Eight cruise liner call this their port • Two new cruise terminals, at a cost of over $30 millions each, are under construction

  7. Economic • Creates 110,000 jobs • $16 billion annually in regional economy

  8. Project History • 42-foot Project Authorized in 1990 • Sponsor requested to design and construct the project (Phase I and II) • Section 204(e) Agreement executed • Phase I completed on Aug 1993 • Phase II awarded Sep 1994 to Dutra Construction • Project encountered problems associated with hard rock and was not completed in its entirety • In April 2004, a PCA was executed to allow the Corps to complete the project

  9. Dredging Contract RFP included a Base Bid and 5 Options Base bid = USACE Deepening Dredging Option 1& 4 = USACE Maintenance dredging Option 2 & 3 = Deepening of berthing areas for POM Option 5 = POM Maintenance dredging Awarded on 30 Sep. 2004 to Great Lakes Dredge & Dock Co. Completion date = 20 July 2006

  10. MIAMI HARBOR FLORIDA Contract W912EP-04-C-0024 Base - USACE Deepening Dredging Option 1 - USACE Maintenance Dredging Option 2- POM Deepening Dredging of Berthing Areas Option 3 - POM Deepening Dredging of Berthing Areas Option 4 - O&M USACE Maintenance Dredging Option 5 - POM Maintenance Dredging

  11. Major Challenges • Federal Funding

  12. Public NMFS EPA POM FWS FDEP FWC COE GLDD NGOs OEA CAMA Others Major Challenges (continued) • Complexity of Coordination

  13. Major Challenges (continued) • Blasting Perception

  14. Major Challenges (continued) • Dredging in Biscayne Bay, Outstanding FL Waters • Zero NTUs from background

  15. Major Challenges (continued) • Environmental resources • Adjacent Seagrasses • Endangered and protected Species

  16. Contact Luis “Rene” Perez Senior Project Manager US Army Corps of Engineers Phone #: 904-232-1597 luis.r.perez@usace.army.mil

  17. Amazing what people can do when they put their minds together!!!