Typical Schematic of SPV system for BTS load. Grid Power. 48V SMPS charger. Solar PV Array. AMF Panel. -48V SCR. Battery Bank 48V VRLA. BTS load 48V/3kW. Tata BP Solar scope of supply. D.G Set. Lack of grid connectivity affecting TELECOM
E N D
Typical Schematic of SPV system for BTS load Grid Power 48V SMPS charger Solar PV Array AMF Panel -48V SCR Battery Bank 48V VRLA BTS load 48V/3kW Tata BP Solar scope of supply D.G Set
Lack of grid connectivity affecting TELECOM Inadequate power supply by grid at remote ,hilly places. The set up cost ,fuel cost , maintenance cost for DG sets . Issues
Solution ... • A stable and assured source of power supply. • Power to be accessible anywhere all year round. • Easy and quick installation at affordable cost. • Low maintenance with very low down time. • Modular and decentralized stand-alone system. • Providing reliable cost-effective power to • telecommunication networks in rural areas
Telecom Sector … Solar power offers reliable, cost-effective power solutions for telecom networks Applications: • Rural Payphones & Cellular Network. • Single Subscriber Telephones. • Multi-Access Radio. • Microwave Repeaters. • Fiber Optic Repeaters. • Domestic Satellite and Radio system • Telemetry Systems. • Any technology: VSAT, UHF, VHF…
Solar Charge Regulator TBP Solar Solution… Solar PV Module DC-AC Converter Load • Typical Dimensions: • Solar Module TBP 12V,10Wp : 561 x 231 x 17 mm • Charge Regulator 12V-5A : 90 x 65 x 40 mm • Battery 12V-7Ah : 150 x 65 x 95 mm • Battery Box : 180 x 85 x 150 mm (Approx) • DC-AC Converter : 120 x 100 x 100 mm (Approx) Battery Bank
Solar Charge Regulator Solution for VSAT. Solar PV Module VSAT Load Battery Bank
Solar Charge Regulator Solution for Village Telephony Solar PV Array Telecom Load Battery Bank
PCU AC/DG Source Hybrid Solar Solution Solar PV Module Communication equipment Battery Bank
International Success • Won the Alcatel Contract for • Bhutan Telecom • Order value - 2.7 Million Euros • Complete design, engineering, supply • and installation by Tata-BP Solar. • Greatly help improve rural connectivity • for Bhutanese people.
Why Solar … • PAKISTAN RECEIVES ABANDUNT SOLAR RADIATION. • SAVES INVESTMENT COST ON UPS / GENSET OR ANY • OTHER SOURCE OF POWER REQUIRED OTHERWISE. • REDUCES DEPENDENCY ON GRID SUPPLY WHICH MAY • NOT BE AVAILABLE IN REMOTEST & INHOSPITALABLE • PLACES AROUND THE COUNTRY. • GENERATES CLEAN ELECTRICITY.
Why Solar … • SOLAR SYSTEMS ARE LOW MAINTENANCE SYSTEMS. • TBP HAS DEVELOPED SOLAR STILS WHICH GENERATES • DISTILLED WATER FOR TOPPING OF BATTERIES. • THEY ARE IDEAL FOR ‘ON-SITE’ SOURCE OF POWER. • AS THEY ARE STAND ALONE SYSTEMS THERE IS NO NEED TO DIG TRENCHES AND LAY EXPENSIVE CABLES. • SOLAR IS THE FUTURE… • YOU HAVE THE POWER TO MAKE A DIFFERENCE