REVIEW FOR FINAL EXAM. LITERATURE RESEARCH. TYPES OF REFERENCES ARE AVAILABLE THROUGH THE LIBRARY TYPES OF INFORMATION THAT SHOULD BE RETRIEVED USE OF REFERENCE IN DEVELOPING THE DESIGN USE OF REFERENCES IN DEVELOPING THE REPORT. PROJECT SCHEDULING. METHODS OF PLANNING A PROJECT
E N D
LITERATURE RESEARCH • TYPES OF REFERENCES ARE AVAILABLE THROUGH THE LIBRARY • TYPES OF INFORMATION THAT SHOULD BE RETRIEVED • USE OF REFERENCE IN DEVELOPING THE DESIGN • USE OF REFERENCES IN DEVELOPING THE REPORT
PROJECT SCHEDULING • METHODS OF PLANNING A PROJECT • METHODS OF DEVELOPING AND PRESENTING A PROCESS SCHEDULE
TIME VALUE OF MONEY • THE TIME VALUE OF MONEY DEFINITION • TYPES OF INTEREST • METHODS OF FINANCING PROJECTS • CALCULATION OF MORTGAGE OR BOND PAYMENTS
TEAM DYNAMICS • PERSONALITY NEEDS FOR TEAM CONSTRUCTION • HOW ARE THESE PERSONALITIES IDENTIFIED
PROJECT COMMUNICATION • FUNCTIONS OF VARIOUS TYPES OF DRAWINGS AND DIAGRAMS • FLOWSHEETING
EQUIPMENT DESIGN • METHODOLOGY APPLIED FOR VARIOUS TYPES OF EQUIPMENT • DETERMINATION OF COSTS USED FOR ESTIMATES • CAPITAL • CONSTRUCTION • OPERATING
PROCESS AUXILLIARIES • DEVELOPMENT OF COST ESTIMATES • UTILITIES • INTERCONNECTING SYSTEMS • INSTRUMENTATION • CIVIL STRUCTURAL • PIPING SYSTEMS • ELECTRICAL POWER SYSTEMS • BUILDINGS & GROUNDS
ENVIRONMENTAL HEALTH & SAFETY • METHODOLOGIES FOR • HAZOP • HAZAN • ENVIRONMENTAL PERMITTING • DESIGN FOR ENVIRONMENT • PRIMARY SAFETY SYSTEMS • SPRINKLERS • GROUNDING
PROCESS CONTROL • PRIMARY CONTROL SYSTEMS • CONTINUOUS • BATCH • INTEGRATION SYSTEMS • INTERLOCKS • PLC’s • SYSTEMS FOR START-UP, INTERRUPTIONS & SHUT DOWN • FAIL-SAFE SYSTEMS
OPERATING COST ESTIMATES • DEVELOPING THE PROCESS BUDGET COMPONENTS
CAPITAL ESTIMATES • PURCHASED EQUIPMENT COSTS • FACTORS FOR OTHER COMPONENTS • WORKING CAPITAL ESTIMATES • METHODS FOR CALCULATION OF DEPRECIATION • FINANCING METHODS
CASH FLOW ANALYSES • PROFITABILITY CALCULATIONS • VARIOUS FORMS OF ROI • DCRR • BREAKEVEN CALCULATIONS • METHODS TO EVALUATE ALTERNATIVES