Electrical Balance of Plant (eBoP) - Reference Plants. BU Power Generation. Control & Electrical Systems. Ras Abu Fontas B2 Power Plant, Qatar. Customer’s need Supply of complete electrical balance of plant to the EPC GE for the power plant Extension of ABB GIS “ABB knows what to do”
E N D
Electrical Balance of Plant (eBoP) - Reference Plants BU Power Generation
Control & Electrical Systems Ras Abu Fontas B2 Power Plant, Qatar Customer’s need • Supply of complete electrical balance of plant to the EPC GE for the power plant • Extension of ABB GIS “ABB knows what to do” • Coordination between owner, contractor and supplier ABB’s response • Delivery of turnkey package for the eBoP of the CCPP and a 230 kV GIS Substation • Management and coordination of all works from generator terminals to HV grid connection Customer’s benefit • ABB takes full responsibility for engineering & coordination activities normally done by an architect engineer • ABB enables GE as EPC to fulfil tight and demanding time schedule
Control & Electrical Systems Vietnam - Uong Bi Power Plant, EVN Customer: LILAMA - EVN Uong Bi 300 MW Extension Coal Fired Power PlantCountry: VietnamOrder Year: 2003 (DCS) / 2004 (eBoP) ABB Scope: • Distributed control system, full automation, protection and monitoring of power plant • Generator circuit breaker • Isolated phase bus • Transformers • Medium voltage switchgear • Low voltage switchgear • DC / UPS system • MV and LV cables and support system • System design and engineering • Project management ,installation supervision, testing & commissioning
Control & Electrical Systems Malaysia - Gelugor CCPP, TNB Scope of ABB Supply: • Project management, engineering, testing, commissioning, and installation support • Control system • Continuous emission monitoring • Generator transformers • Unit/Station transformers • 6.6kV auxiliary transformers • 6.6kV switchgear • 415V switchgear (motor control centre) • Isolated phase busduct • Generator circuit breakers (GCB) • DC/ Uninterruptible power supply system • Protection relay panel • Location: Penang Island, Malaysia • 325MW Combined Cycle Power Plant • Gas turbine: GE • Steam turbine: Fuji Electric • EPC contractor: Kawasaki Heavy Industries • Project completion: Year 2003
Control & Electrical Systems EDELCA Guri (Venezuela) Modernization Customer’s need • Modernization of a 10 GW hydro plant • Extend the life cycle of the plant by 30 years • Improve levels for plant availability ABB’s response • Delivering of turnkey package consisting for 20 generating units of • Instrumentation & unit control systems, • Electrical protections and communication Customer’s benefit • ABB takes full responsibility: design, fabrication, installation, testing, commissioning and training • Application of state-of-the-art technologies • Transfer of technology guaranteed: ‘On-The Job’ training program
Yixing Pumped Storage (China) Customer’s need: • Electromechanical package for 4x250MW Pump storage power plant ABB’ Response • GE/ABB consortium for electro-mechanical package • Control & protection systems • Electrical scope: MV switchgear, generator circuit breaker, isolated phase bus, excitation, SFC, cabling Customer Benefit • Completely automated – remote control from two dispatch centers • Fully integrated control, protection and electrical system
El Canada (Guatemala) Customer’s need • Water to wire package for 2 x 26 MW hydroelectric power plant • Executed in consortium with GE ABB Scope: • Control • Protection • Station service • Main transformer • Substations • Engineering & commissioning • Installation Customer’s benefit: • Project completed successful in record time
ABB: EPM Guadalupe (Colombia) Colombia, South America Hydro Chain Control/Optimization • 528 MW (3 plants) • Hydro plant automation upgrades ABB Scope • Hydro chain control and optimization • Plant control (local/remote) • Station service (AC/DC distribution) • Instrumentation (COABB) • Engineering, training • Commissioning supervision (COABB)
Concepcion, Panama, Istmus Hydro • ABB/Mavel Consortium • Project: 2 X 5 MW • 2 Horizontal Francis Turbines • Based on model test • Water to wire package, including bifurcation • EPC Contractor – work closely together • Capacity and efficiency guarantees • Fist project of its kind in Panama