Project Team Introductions • Butler University: • Barry Collier – Athletic Director • Craig Hardee – Project Manager • Rich Michal – Director of Facilities • Amanda Duenges – Engineering manager
Project Team Introductions • Architect/ Engineer: • Brock Roseberry – Ratio Architects Associate • Tom Durkin – DVPE Mechanical Engineer • Al Villalta – DVPE Electrical Engineer • David Lach – Cripe Civil Engineer • Victoria Emery – Arsee Structural Engineer
Project Team Introductions • Construction Manager • Bob Bursack – Project Executive • Tom Schmitt – Chief Estimator • Jeff Johnson – Project Superintendent • Milaina Thompson – Project Engineer
Project Background • The historic Hinkle Fieldhouse is home to Butler Bulldog basketball, as well as other division 1 sports and with the recent success in national basketball tournaments has decided to renovate most of the fieldhouse locker rooms, athletic offices, concessions, alumni club, weight room, sports medicine facilities, restrooms, etc. Hinkle Fieldhouse was originally built in 1928.
Project Goal • For Butler University Athletics to upgrade most of the athletic and classroom areas in Hinkle Fieldhouse. The Fieldhouse is home to BB, VB, football, baseball, softball, golf, tennis and campus PE. Butler athletics is committed to keeping the original aesthetic look while improving areas. The renovation will enhance 1) The student athlete experience and building life and 2) The fan experience and athletic office improvements.
Contractor/ Supplier information • Safety program highlights • Turner prequal requirements process • Safety program/ Procedures manual review • LEED silver accredidation goal • Diversity goals • Site/ Interior phasing and logistics
Phasing Plan • (insert)
Bidding scope and schedule • BG1 – demolition, concrete, steel, elevator, site utilities – distribute 1-23-13, bid 2-14-13 • BG2 – Arch, MEPFP, interior selective demolition – distribute 2-5-13, bid 2-28-13 • Grade beam distribution system for bid invitation and bid form/scope of work • Invited bid list • Plan copy shop available - Reprographics • Planned addendums