170 likes | 301 Views
Base framework. Bottom frame. Setting up of frame bars. Setting up of Cover frame. Frame bar connection. Frame bar skeleton. Subassembly of outer cover. Connector pipes. Inner wall partly assembled. Floor construction. Feed Throughs. Penetration Detector wiring. Connections inside.
E N D