Emergency Purchasing: When You Don’t Have Time To Bid Norma Houston 2013 NCEMA Fall Conference
Recovery Needs Debris Removal Roof Repair / Equipment Replacement Vehicle Replacement Water Main Repair / Potable Water
What is a Valid Public Contract? Budget / Pre-audit Writing Authority Proper Procurement Methods Valid Contract Offer Acceptance Consideration Other Legal Requirements
Which Procurement Method? • Type of Contract • Cost • ProcurementMethod
Type of Contract Type of Contract Purchase Apparatus, supplies, materials, & equipment Construction or repair – new buildings, renovations, “non-vertical” construction (utility lines, roads, etc.) Design services – architectural, engineering, survey, construction manager at risk Everything else – Service contracts (other than design services) fall into this category • Services
Type of Contract Type of Contract Construction or RepairNew buildings, renovations, “non-vertical” construction (utility lines, roads, etc.)
Type of Contract Type of Contract “Mini-Brooks Act” design services architectural, engineering, survey, CMR, DB, BDD, P3
Type of Contract Type of Contract Everything Else Includes service contracts and land purchases
Cost • Type of Contract • Cost Bidding Thresholds
Procurement Method Type of Contract Cost ProcurementMethod • Informal Bidding • Applies to purchases and construction/repair within a certain cost range • Has minimal requirements to ensure competition with focus on getting the lowest cost
Procurement Method Type of Contract Cost ProcurementMethod • Formal Bidding • Applies to purchases and construction/repair above a certain cost • Has very specific requirements to ensure competition with focus on getting the lowest cost
Procurement Method Type of Contract Cost ProcurementMethod • Qualifications Based Selection (QBS) • Required for selection of “Mini-Brooks Act” services - architect, engineer, survey, CMR, DB, DBB, P3 • Contract award based on qualifications of responder rather than price • Local government can exempt itself in writing if contract is under $50,000.
Procurement Method Type of Contract Cost ProcurementMethod • Requests for Proposals (RFP) • Optional for IT purchases • Can be used (but is not mandated) for other service contracts
Procurement Methods – State Law FormalBidding FormalBidding Qualifications-BasedSelection No Method Required $500,000 Informal Bidding $90,000 Cost of Contract (Bid Thresholds) Informal Bidding $30,000 No Method No Method $0 Construction & Repair Mini-Brooks Act Everything Else* Purchase *Use of RFP optional, but not required Type of Contract
Procurement Methods – GMCR (federal) SealedBidding SealedBidding Competitive Proposals (price not considered) Competitive Proposals $150,000 Cost of Contract Small Purchase Small Purchase $0 Construction* Mini-Brooks Act Everything Else* Purchase* Type of Contract *May use competitive proposals when sealed bidding not appropriate; may use non-competitive proposals under special circumstances.
Procurement Methods – State Law FormalBidding FormalBidding Qualifications-BasedSelection No Method Required $500,000 Informal Bidding $90,000 Cost of Contract (Bid Thresholds) Informal Bidding $30,000 No Method No Method $0 Construction & Repair Mini-Brooks Act Everything Else* Purchase *Use of RFP optional, but not required Type of Contract
Competitive Bidding Exceptions • Special Circumstances • Sole Source • Emergencies • Fuel • Force Account Work • Existing Contracts • State and Federal Contracts • Piggybacking • Change Orders • Direct Purchases • Purchases From Other Units of Government • Group Purchasing Programs • Used Items
Competitive Bidding Exceptions Existing Contracts Special Circumstances Direct Purchases • Emergencies GS 143-129(e)(2) • Applies to purchases and construction/repair • Must be special emergency involving public health and safety or property • Emergency must be imminent or existing • Cannot be generally anticipated to occur in the future • Cannot use if competitive bidding requirements can be used without exacerbating harm • Competitive bidding requirements still required for FEMA reimbursement • Board approval not required
Competitive Bidding Exceptions Existing Contracts Special Circumstances Direct Purchases • Force Account Work GS 143-135 • Applies to construction/repair(not purchases) • Construction work performed by unit’s own officers or employees • Total cost of project under $125,000 or • Total cost of labor under $50,000 • Must file owner-builder affidavit • Board approval is required
Competitive Bidding Exceptions Existing Contracts Special Circumstances Direct Purchases • State and Federal Contracts GS 143-129(e)(7),(e)(9),(e)(9a) • Applies to formal and informal purchases (not construction) • Purchasing same itemfrom same vendor • Vendor must agree to sell at the same or more favorable prices, terms, and conditions • Includes state P&C contracts, IT purchases through ITS, and federal agency contracts • Board approval not required • Piggybacking: (GS 143-129(g) • Exception to competitive bidding requirements (formal purchases only) • Purchasing same itemfrom same vendor • Vendor must agree to sell at the same or more favorableprices, terms, and conditions • Contract competitive bid within previous 12 months • Board approval IS required with 10 days public notice
Competitive Bidding Exceptions Existing Contracts Special Circumstances Direct Purchases • Piggybacking GS 143-129(g) • Applies to formal purchases only • Purchasing same item from same vendor • Vendor must agree to sell at the same or more favorable prices, terms, and conditions • Contract competitive bid within previous 12 months • Board approval is required with 10 days public notice
Do You Have To Bid? Debris Removal Roof Repair / Equipment Replacement Vehicle Replacement Water Main Repair / Potable Water
Do You Have To Bid? Roof Repair / Equipment Replacement Equipment Replacement: Probably so, unless necessary for immediate restoration of public safety capabilities Hiring An Architect: Mini-Brooks Act QBS process still applies (can only exempt if fees are under $50,000) NO: Temporary repairs to stabilize structure and prevent further damage YES: Permanent repairs and reconstruction REMEMBER GMCR Bidding Requirements!
Do You Have To Bid? Vehicle Replacement YES: Complying with bidding requirements will not unduly delay purchase, especially in informal bidding range ($30,000-$90,000) REMEMBER GMCR Bidding Requirements! Other Options: • Purchase from another unit of government • Donation from other unit of government • Buy off state/federal contract
Do You Have To Bid? Water Main Repair / Potable Water NO: Potable water and temporary repairs to stabilize system YES: Permanent repairs and reconstruction REMEMBER GMCR Bidding Requirements! Hiring An Engineer: Mini-Brooks Act QBS process still applies (can only exempt if fees are under $50,000)
Do You Have To Bid? Debris Removal NO: Debris removal is a service contract; service contracts not subject to state competitive bidding requirements YES:For FEMA reimbursement REMEMBER GMCR Bidding Requirements! What About Debris Monitoring? Same as for debris removal
Tips for Emergency Purchasing • Preposition contracts using a competitive bidding process • Secure temporary supplies and equipment through mutual aid instead of purchasing • Remember minimal requirements for informal bidding process: • Purchase = $30,000-$90,000 • Construction/Repair = $30,000-$500,000) • No formal advertisement • No sealed bid/public bid opening • No 3-bid minimum • Can get price quotes in any form (phone, fax, email, etc.) • Keep record of bids