Brosituationen i Finland. Matti Piispanen:. Finska broar Finska Vägadministration i dag Broadministration Brounderhåll Senaste vägprojekter. Bridges on Public Roads 1.1.2006. Total length of public road network 78 000 km 14 283 bridges including 2 929 culverts

yadid
Download Presentation

Brosituationen i Finland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brosituationen i Finland Matti Piispanen: Finska broar Finska Vägadministration i dag Broadministration Brounderhåll Senaste vägprojekter Dansk Brodag 2006

  2. Bridges on Public Roads 1.1.2006 • Total length of public road network 78 000 km • 14 283 bridges including 2 929 culverts • Total deck area 3,55 million m2 • Total length 350 km • The replacement value of the bridge stock is 4,4 Milliard € Dansk Brodag 2006

  3. Typical Finnish Bridges • Concrete slab as a flyover • Concrete frame as an underpass • Composite bridge as a strait crossing Dansk Brodag 2006

  4. Largest Bridges Bridge Leght/span/area Constr (m / m / m2) Raippaluodon silta, Mustasaari 1045 / 250 / 12540 1997 Tähtiniemen silta, Heinola 925 / 165 / 20929 1993 Kärkisten silta, Korpilahti 788 / 240 / 9456 1997 Saimaan silta, Puumala 781 / 140 / 10153 1995 Lapinlahden silta, Helsinki 597 / 125 / 10202 1965 Mansikkakosken silta, Imatra 557 / 75 / 12874 1973 Suvantokadun silta, Joensuu 542 / 50 / 7581 1974 Tervolan silta, Tervola 494 / 72 / 4813 1975 Kirjavanjärven silta, Vihti 481 / 18 / 5293 1976 Kaitaisten silta, Taivassalo 477 / 90 / 4078 1982 Dansk Brodag 2006

  5. Material Distribution of Bridges on Public Roads Dansk Brodag 2006

  6. Age Distribution of Bridges Dansk Brodag 2006

  7. L Rovaniemi Oulu Uusimaa U O Turku T Kaakkois-Suomi KaS Häme H Savo-Karjala SK Keski-Suomi KeS V Kuopio Vaasa V Vaasa SK KeS Oulu O Lappi L Jyväskylä Tampere KaS T H Kouvola Turku U Helsinki Finnish Road Administration • Central administration in Helsinki (250) • Administration • Ordering (R&D, Instructions etc) • Expert help to road districts • National duties • 9 Road Regions (750) • Operation • Ordering (Design, Construction) • Out-house • Consulting (R&D, instructions etc) • Design • Construction Dansk Brodag 2006

  8. Finnra Organisation History 1986 - 1986 • The Finnish Roads and Waterways Administration • 13 road districts 1990 • The Finnish Road Administration, Finnra • Waterways under the Finnish Maritime Administration 1992 • Nine road districts 1998 • Central Administration and Production (internal) 2001 • From Production to a state owned company: The Finnish Road Enterprise, separeted from Finnra 2005 • New organisation inside Finnra • The Finnish Road Enterprise in open competition Dansk Brodag 2006

  9. Finnra personnel 1980- 2001 2006 goal Production 4000 3000 ? Administration 1100 1000 850 Dansk Brodag 2006

  10. Bridge tasks in Finnra 2006 Central administration in Helsinki Personnel ca 25 • Bridge policies • Tecnical requirements for bridges • Technical support to road districts • Inspection of bridge plans • Managing R&D • upkeep and developement of IT-systems • Statistics Road districts (9) around Finland Personnel ca 15 • Managing of inspections • Managing of maintenance works • Managing of construction works • Datainput toBMS Inspections, Maintenance and Construction works by private partners Dansk Brodag 2006

  11. The Finnish Bridge Management • Policy • Maintenance strategy • Yearly Budget and Targets • Inspection of bridges • Inspection types • Bridge Inspectior Qualifications • BMS (Siltarekisteri) • Reference group for modelling Network Level BMS • Project Level BMS • Programming of the works • Road district • BMS Dansk Brodag 2006

  12. Maintenance Strategy • No bridges with limited load on main roads • Number of bridges with limited load is decreasing • Bottleneck bridges on heavy vehicle routes repaired • Rehabilitation of the bridges under low traffic might be postponded Yearly targets and budgets are set from • The Ministry of Transport and Communications Finland • The Finnish Road Administration, Central Administration Yearly targets Dansk Brodag 2006

  13. Number of Bridges in Very Bad Conditionin 1991-2004 Dansk Brodag 2006

  14. Budget Needs for Bridge MR&R Dansk Brodag 2006

  15. Developement of the finansing gap with different inputs (Yearly need) Dansk Brodag 2006

  16. Bridge Inspection Types for common bridges Acceptance inspection • by the costructor and the owner, bridge designer etc. Annual inspection • by road foremen General inspection (every 5-8 years) • by certified bridge inspectors Underwater inspection • by certified bridge inspectors Dansk Brodag 2006

  17. Bridge Inspection Types for special bridges Basic inspection (Reference bridge group and large bridges) • by certified bridge inspectors with B.Sc., M.Sc. or higher examinations Special inspection (for problematic bridges) • by bridge specialists with M.Sc or higher examinations Intensified monitoring • by road foremen or certified bridge inspectors Dansk Brodag 2006

  18. Bridge Inspector Qualifications Bridge Inspector Examination • Theoretical period of 4 days • Working on the bridge site and examination period of 2 days Basic course in Bridge Register use • 2 days • Requirement for getting updating rights of the Bridge Register Advanced Yearly Training Day • One day ”calibration” of inspectors • General inspection of two bridges as a test, model result of the inspections is given and discussed • Personal quality points are given. Repeated weak test results lead to loss of the certificate Dansk Brodag 2006

  19. Reference Bridge Group for Modeling A purposive sample of 106 bridges and 26 steel culverts representing the whole bridge stock Aim of the reference bridges • To improve knowledge of bridge age behaviour and durability • To improve BMS deterioration models Dansk Brodag 2006

  20. Bridge maintenance • Present method Bridge engineer (1..2/road district) • orders inspections • plans the works according to BMS, budgets etc • orders the bridge repair plans • orders the maintenance works • spot checks the quality of maintenance works (or orders it) • New ideas 1, "Maintenance manager" Bridge engineer orders from the consultant: • inspections (or managing the inspections) • preparation of the work programme • bridge repair plans, if not included in repair contract • preparation of the tender documents • quality control and orders the (inspections),maintenance works and follows the quality of the consultant Dansk Brodag 2006

  21. New idea 2, Bridge service Contract, SILTOPA • Tried in Oulu spring 2006 • Contract time 5 years, ca 300 bridges • 4 good offers but prices 10-15% too high • Risk too high?

  22. E18 Muurla - Lohja • Includes • 51,3 km motorway • 7 tunnels (5,2 km) • 48 bridges • PPP -project • life cycle model • Design-Build-Finance-Operate 25 years • 4 offers, winner Ykköstie Oy • Estimated savings 5-20 M€ + early opening • Construction time 2006-2009 • Contract price 638 M€, contruction works 299 M€ • Yearly payments according to recieved service (availability, funktionality, durability) Dansk Brodag 2006

  23. Vuosaari Harbor project (VUOLI)

  24. Basic data of Vuosaari Harbour • quay length 3.6 km • berths 15 to 20 • capacity 12 million ton /year • fillings 12 million ton • jobs 1000 • area 150 hectares • business park 73 hectares • filling area 90 hectares • costs 260,6 million € • Ready 2008 Dansk Brodag 2006

  25. Harbour Road • harbour road 2.5 km • Porvarinlahti tunnel 1.6 km • improvement of Ring III 1.0 km • improvement of Itäväylä 1.4 km • light traffic routes 4.1 km • ramps 3.8 km • bridges 11 pcs • noise barriers 2.1 km • costs 33.0 million € Ring III Harbour road Dansk Brodag 2006

  26. Harbour Rail • single track 19 km • Labbacka tunnel 0.6 km • Kerava tunnel 13.5 km • bridges 4 pcs • noise barriers 1.1 km • costs 157,3 million € Dansk Brodag 2006