1 / 8

DLA GFM/MCA

DLA GFM/MCA. Mr. Bill Shaffer 2 February 2010. Legacy DLA acted as an MCA for DLA contracts Complied with all MCA requirements System Modernization Changes New “Push” methodology eliminates the need for an MCA for DLA contracts Control of inventory is performed within SAP

yadid
Download Presentation

DLA GFM/MCA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DLA GFM/MCA Mr. Bill Shaffer 2 February 2010

  2. Legacy DLA acted as an MCA for DLA contracts Complied with all MCA requirements System Modernization Changes New “Push” methodology eliminates the need for an MCA for DLA contracts Control of inventory is performed within SAP DLA continues to support procedures within 4140.1-R where DLA is the source of supply Introduction

  3. GFM Process Note – If no BOM is required – Sub-contracting PO created manually based on available stock SAP GFM Warehouse Depot or Vendor Managed Warehouse (Burlington) 3. 1a. Manugistics/ JDA 7. Create Delivery Order/Purchase Order Sub-Contracting PO generated Blocked for Manual Review – adjust Plant and Storage location – if needed BOM details GFM required for End Item and GFM default plant GFM Delivery request sent to Warehouse/Depot 2. 1. 4. 6. PR for End Item (NSN) received from Planning Create Sub-contracting PR GFM Delivery Requests consolidated and shipments scheduled Manual Review GFM Delivery request created 9. GFM shipped to Vendor 1b. Create Sales Order 8. Shipment confirmation received - GFM identified as ‘issued to contractor’ 5. PO Sent to Vendor Due-in created for End-item Vendor 10. 13. 10a. Customer Vendor Ships End item to DLA Depot DSS sends receipt 12. Goods Receipt back-flushes Sub-contracting PO GFM consumed by End Item Customer sends receipt 11. Vendor Ships End Item to Customer

  4. Internal DLA GFM processing makes use of Standard SAP functionality involving the Subcontracting Purchase Order (PO) process to control delivery of GFM The GFM PR will identify GFM components by means of a Bill of Materials (BOM) The PR will list the end item and required components along with the amount of component materiel required for each end item When the GFM PR is awarded the BOM/component allocations are carried forward to the Subcontracting PO DLA GFM Process-Alternative to MCA

  5. After contract award an internal transaction is used to trigger the Subcontracting PO to initiate the GFM issue process of the end item components to the contractor There is no MILS/DLMS requisition in this process A MILS/DLMS compliant Materiel Release Order (MRO) is generated for each component NSN to move the materiel to the contractor The MRO has the DLA EBS DoDAAC in the document number and the contractor DoDAAC as the ship-to There is no identifying contract number in the MRO DLA GFM Process-Alternative to MCA

  6. The shipping depot provides a confirmation of shipment back to EBS via a standard MILS/DLMS Materiel Release Confirmation (MRC) When the confirmation is processed the shipped material moves from a release in-process status to a Material Provided to Vendor status Materiel Provided to Vendor is a stock category under the storage site that shipped the materiel It is a restricted stock category identified by vendor, but not by contract number Receipt of the end item will cause the components to be removed from Material Provided to Vendor on the basis of the components listed on the PO and the quantity of end items received DLA GFM Process-Alternative to MCA

  7. The DLA Subcontracting PO process assumes all DLA GFM requirements will be for items managed by DLA and issued from stock Other Service/Agency GFM requisitions received by DLA are still validated with the designated MCA prior to initiating order fulfillment action DLA GFM Process-Alternative to MCA

  8. Available SAP Reporting BOMs by end item PRs and POs by contract number (with linked BOM) Deliveries against a PO All stock provided to a vendor with end-items due (can be drilled to specific vendors) Existing due-ins established by GFM POs Reporting & Record Keeping

More Related