1 / 23

P13222: FSAE Turbocharger Integration

Detailed Design Review. P13222: FSAE Turbocharger Integration. Thursday, November 8 th , 2012 Kevin Ferraro, Phillip Vars , Aaron League Ian McCune, Brian Guenther, Tyler Peterson. Agenda. Customer needs review System architecture Specifications overview

yamka
Download Presentation

P13222: FSAE Turbocharger Integration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Detailed Design Review P13222: FSAE Turbocharger Integration Thursday, November 8th, 2012 Kevin Ferraro, Phillip Vars, Aaron League Ian McCune, Brian Guenther, Tyler Peterson

  2. Agenda • Customer needs review • System architecture • Specifications overview • Review of compliance with requirements • Updated risk assessment • Testing Plans • Bill of Materials • Timeline/Schedule

  3. Customer Needs Review

  4. Specifications Table

  5. System Architecture • Induction • Turbocharger • Boost control • Engine • Exhaust system • Mounting

  6. Induction

  7. Spike Throttle

  8. Intercooler CFD and GT-Power Simulation Inlet, hot side: max spec temp from turbine outlet Inlet, cold side: ambient environment N=number of cells Width Thickness

  9. Turbocharger

  10. Turbocharger

  11. Boost Control

  12. Boost Control

  13. Boost Control

  14. Exhaust System

  15. Header Design

  16. GT-Power Simulation

  17. Mounting System

  18. Mounting

  19. Risk Assessment

  20. Testing Plans • Purchasing: Ti tube • Manufacturing: Throttle, plenum, plumbing • Initial setup/baseline • Dyno data collection, RPM sweeps: Horsepower, torque, AFR, BSFC, throttle position, etc • Labview: Dyno Controller software

  21. Testing Plans

  22. Bill of Materials

  23. Timeline/Schedule

More Related