1 / 1

[1] D. Boussard, “ Beam Loading ", CERN 9 5 - 06 199 5 .

REFERENCES. [1] D. Boussard, “ Beam Loading ", CERN 9 5 - 06 199 5 . [2] P. Wilson , CERN ISR-TH/78-23, 1978 [3] R. Boni, A. Gallo, " Stationary beam loading on DA F NE cavity accelerating mode", DA F NE Techn. Note RF-5, 1992.

yan
Download Presentation

[1] D. Boussard, “ Beam Loading ", CERN 9 5 - 06 199 5 .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REFERENCES [1]D. Boussard, “Beam Loading", CERN 95-06 1995. [2] P.Wilson, CERN ISR-TH/78-23, 1978 [3]R. Boni, A. Gallo, " Stationary beam loading on DAFNE cavity accelerating mode", DAFNETechn. Note RF-5, 1992. [4] F. Pedersen, “Beam Loading Effects in the CERN PS Booster", IEEE Trans Nucl Sci. Vol NS-22, N. 3, June 1975, p 1906-1909. [5]D. Boussard, "Design of a ring RF system", CERN 91-2 (RFS) July 1991 [6]R. Garoby, "Beam loading in RF cavities", Proc. of 1990 Joint US-CERN School "Frontiersof Particle Beams: Intensity Limitation". [7]M. Sands, "Beam-Cavity Interaction - Basic Considerations", Tech. Rep. 2-76 Laboratoirede l' Accélérateur Linéaire Orsay, 1976. [8]K.W. Robinson, "Stability of Beam in Radiofrequency System", CEAL - 1010 CambridgeElectron Acc., Cambridge 38 Massachusetts, 1964. [9]G. Hofmann, "Coherent Beam Instabilities", Proc. of 1990 Joint US-CERN School"Frontiers of Particle Beams: Intensity Limitation". [10] F. Pedersen, “A Novel RF Cavity Tuning Scheme for Heavy Beam Loading", IEEE Trans Nucl Sci. Vol NS-32, N. 5, Oct. 1985, p 2138-2140. [11] D. Boussard et al, “Collective Effects at Very High Intensity in the CERN PS", IEEE Trans Nucl Sci. Vol NS-26, N. 3, June 1979, p 3568. [12] D. Boussard et al, “Control of Cavities with High Beam Loading", IEEE Trans Nucl Sci. Vol NS-32, N. 5, Oct. 1985, p 1852. [13] P. Barrat et al, “RF System and Beam Loading Compensation on the ISIS Synchrotron", EPAC, Nice, June 1990, p. 949 [14] J.M.Byrd et al, “ Transient Beasm Loading Effects in Harmonic RF Systems for Light Source”, Phys. Rev. ST Accel. Beams 5, 092001 (2002) [15] D. Alesini et al, Longitudinal Beam Dynamics in the Frascati DAFNE e+e- Collider with a Passive Third Harmonic Cavity in the Lengthening Regime” Phys. Rev. ST Accel. Beams 6, 074401 (2003) [16] J.E.Griffin, “Synchrotron Phase Transition Crossing Using an RF Harmonic", Fermilab 3-91

More Related