Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois

Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois. A Strong Beginning for Illinois Wind Robert Nagel robertn84@gmail.com. Project Overview. Phase 1: 120 Turbines As of 4/28/07: 64 Operational Turbines Phase 2: 120 Turbines

yardley
Download Presentation

Twin Groves Wind Farm Bloomington Moraine McLean County, Illinois

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Twin Groves Wind FarmBloomington Moraine McLean County, Illinois A Strong Beginning for Illinois Wind Robert Nagel robertn84@gmail.com

  2. Project Overview • Phase 1: 120 Turbines • As of 4/28/07: 64 Operational Turbines • Phase 2: 120 Turbines • Totals: 240 Turbines = 400 Megawatts = 120,000 homes • Spans 50 square miles • 1,500 ft from living spaces • 500 ft from highways • 450 ft from county roads • $700 Million Project Cost • About 12 year Payback period

  3. Tools for Project Estimates • Wind Class • Local Wind Rose • Site Specific Measurements • Turbine Details • Economic Climate of Illinois Electricity Markets http://www.iira.org/pubsnew/publications/IVARDC_Reports_614.pdf

  4. 2002-2007 • Horizon Launches Idea to Landowners • Informational Dinners & Private Meetings • Authorize Test Towers at proposed sites • Federal Production Tax Credit • 1.8 cents per KWh for 10 years • Positive Test Data • 17 mph @ 80 m • Capacity Factor: 35-39% means producing the rated power that % of time • Make some sort of electricity over 91% of the time

  5. Vestas V-82~ 1.65 MW • Denmark • Blades, Nacelle, and Rotor • Flown to Louisiana, Railed to Bloomington, Trucked to Sites • Hub Height: 80 m • Blade Diameter: 82 m • Cut In: 7-9 mph • Cut Out: 55 mph • Active Pitch Control • Yaw Mechanism

  6. Transmission • New Construction • 103 Miles Underground Cables • 12 Miles Surface Cables • $1 Million per Mile • 2 Step Up Substations • Local Transmission • Regional Transmission • ComEd Lines

  7. Down on the Farm • Warren and Betty • 6 Turbines • Receive Lease Payments • $5,100 per turbine, per year • payments increase with Consumer Price Index Inflation • Land Options • Leasing: Similar to a fuel cost • Buying: Higher Capital Cost • Limited Liability Corporation (LLC)

  8. Illinois 2006 Electricity Generation 16,444 GWh 2007 Electricity Generation 18,251 GWh 11% Increase Energy Information Administration: Table 1.6.A. Net Generation by State by Sector, January 2007 and 2006 http://www.eia.doe.gov/oiaf/aeo/pdf/trend_2.pdf

  9. Political Conditions • Renewable Portfolio Standards (RPS) • Non-mandatory Goal of 8% in 2013 • Solar Water Heat, Solar Thermal Electric, Photovoltaics, Landfill Gas, Wind, Biomass, Hydroelectric, CHP/Cogeneration • 75% from Wind

  10. Conclusions • Pursuit Yankee Ridge • Land Owners • Site Specific Data • Proximity to Grid Transmission • Politically Encourage Wind Power • Mandatory Renewable Portfolio Standard • Federal Tax Reduction Credit • Carbon Tax