1 / 15

NRENs & Grids Workshop Relations between EGEE & NRENs

NRENs & Grids Workshop Relations between EGEE & NRENs. Mathieu Goutelle (CNRS UREC) EGEE-SA2 activity Amsterdam, 2005-05-12. EGEE Networking Activities. SA2: Network Resource Provision Technical Network Liaison Committee, Operational interface with NRENs, QoS experiment,

yehudi
Download Presentation

NRENs & Grids Workshop Relations between EGEE & NRENs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRENs & Grids WorkshopRelations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2 activity Amsterdam, 2005-05-12

  2. EGEE Networking Activities • SA2: Network Resource Provision • Technical Network Liaison Committee, • Operational interface with NRENs, • QoS experiment, • SLAs installation between EGEE  Network (Geant & NRENs). • JRA4: Network Services Development • Bandwidth Allocation and Reservation, • Network Performance Monitoring, • IPv6 Uptake. Building important working relation between EGEE and the network providers (Geant & NRENs) NRENs & Grids Workshop - Amsterdam, 2005-05-12

  3. Our approach • Network must be viewed as a class of Grid resource: • Like computing and storage resources, • Implies a network resource provisioning architecture, • Problem to manage a resource outside the EGEE world! • This resource depends on the network services provided by the network providers (NRENs, Geant): • Current services: Premium IP (even not in all NRENs), • We need to anticipate on the future GN2 services: • Currently in the definition process, • GN2 project started 6 months later than EGEE. • Network Activities work in a long term perspective: • Most of the tasks started from scratch: Operational interface, SLA, NPM, BAR… • Except the monitoring tools coming from Datagrid (WP7). NRENs & Grids Workshop - Amsterdam, 2005-05-12

  4. Operational interface • Define the interactions between the Grid User support and the NREN NOCs: • SLA management (processing, installation, monitoring), • Trouble management (reporting, interactions). • Definition of proceduresandinformation flows between NOCs and EGEE: • Need of a consistent view of the “EGEE network”, • Need to evaluate its reliability and the quality of the services, • Will not replace the current interactions between a resource centre and its NREN. • Progressive integration into the existing Grid User Support (GGUS, http://www.ggus.org/): • Single entry point for the support to the Grid users, • Difficulties remain (trouble tickets normalization, languages…). NRENs & Grids Workshop - Amsterdam, 2005-05-12

  5. GEANT/NRENs notification handling NREN E-mail notifications GEANT NREN Handling Procedure NREN ENOC Filtering Network related Create an assigned ticket TTS NRENs & Grids Workshop - Amsterdam, 2005-05-12

  6. Troubleshooting workflow Problemassignment Problemsignalling NRENs & Grids Workshop - Amsterdam, 2005-05-12

  7. e2e SLA b2b SLA Campus or Campus or GEANT Local NREN 2 NREN 1 Local Provider Provider EGEE site B EGEE site A A B C D EGEE end-point A EGEE end-point B SLA1 SLA2 SLA • SLA definition: • Based on previous work and answers inside EGEE and from GN2 to some open issues (procedures, demarcation point…), • Definition in cooperation with GN2, • EGEE end-to-end SLA template: • SLA between the border of the NRENs cloud (border-to-border SLA) ; • Difficulty to accommodate and take into account the “last mile”. NRENs & Grids Workshop - Amsterdam, 2005-05-12

  8. SLA institution scenarios • All domains involved in network services provisioning to EGEE as part of the existing network infrastructure hierarchy have to be categorized as: • Compliant with the Premium IP service • Supportive of the Premium IP service • Indifferent to the Premium IP service NRENs & Grids Workshop - Amsterdam, 2005-05-12

  9. QoS experiment • Network service use case for an application: • Choice of a particular “interactive” application, • Aim: • Better knowledge of the SLA processing, • Better specifications of the applications requirements, • Precision about procedures and identified issues. • Status: • Validation on a local platform: • Validation of middleware modifications (packets marking), • Validation of the experimental protocol. • Tests on long distance networks: • First in the same administrative domain (Renater), • Then, tests involving three different networks, • Involved networks: Renater, Geant, GRnet. NRENs & Grids Workshop - Amsterdam, 2005-05-12

  10. Network Performance Monitoring • JRA4 approach: • Standardization of access to network performance monitoring across different domains and frameworks, • GGF NM-WG recommendation is the selected basis for standardisation. • Purpose: • Provide to Grid operations networking information for monitoring and troubleshooting, • SLA monitoring, • Information publication in the Grid Information System. • Potential user : middleware, end-user, Grid operations • Status: • Prototype ready (demo during the last GGF), • Security (on-going work inside EGEE), • Work on the interactions with the middleware. NRENs & Grids Workshop - Amsterdam, 2005-05-12

  11. NM-WG End Site Home grown NM-WG NM-WG Backbone GN2 Backbone PiPEs Network Performance Monitoring Some Client NM-WG End Site EDG WP7 NM-WG Backbone Perfmonit NRENs & Grids Workshop - Amsterdam, 2005-05-12

  12. NM-WG JRA4 NPM Mediator NM-WG End Site Home grown NM-WG NM-WG NM-WG Backbone GN2 Backbone Perfmonit Backbone PiPEs Network Performance Monitoring Diagnostic Client NM-WG End Site EDG WP7 NRENs & Grids Workshop - Amsterdam, 2005-05-12

  13. BAR • Purpose: • Provide Grid users the ability to use network services (reservations), • Interface with the mechanisms that will be available in the network, • Will first propose the Premium IP service. • Status: • Step-by-step integration with the network services: • Static configuration between 2 backbone sites ― june 2005, • Investigation of the “last mile” problem ―oct. 2005, • Pilot reservation system in limited number of site ― jan. 2006. • Need of a strong participation of NRENs (GN2). NRENs & Grids Workshop - Amsterdam, 2005-05-12

  14. Reservation Architecture • Integration of network resource in a more complex architecture: • Essential to meet the applications requirements, • Convergence between the allocation and reservation architecture of the EGEE middleware and the reservation architecture developed by GN2, • Joint work of GN2 and EGEE. • Status: • GN2 architecture is to be defined: • Based on inter-domain SLAs, • A still very manual prototype is foreseen due beginning of next year. • Preparatory work inside EGEE : • Convergence to a common architecture, • Consistency between the two architectures. NRENs & Grids Workshop - Amsterdam, 2005-05-12

  15. Conclusion • Progression of the two activities according to plan, • Good progress in terms of SLAs definitions: will the NRENs support our model? • Test of the operational interface during the summer, • QoS experiment = further step towards the fulfilment of applications requirements in term of network resources, • Good working relations with NRENs and GN2. Questions? NRENs & Grids Workshop - Amsterdam, 2005-05-12

More Related