An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Hazardous Site Inspection Metzger Field March 2, 2000

  2. A Pictorial Overview of a Simulated Environmental Site Survey

  3. Dr. Stephen OsbornMetzger Project Manager Dr. Arthur Kney Metzger Site Manager

  4. Equipment Combustible Gas Indicator Personal Dust Monitor Site Dust Monitor Drum Opener VOC Meter

  5. The Safety and Health Plan is in place Signing of the site Safety and Health Plan

  6. The group enters the Contamination Reduction Zone (CRZ)

  7. Test fit of respirators

  8. The group donning Level C PPE Tyvek Suits Respirator Goggles Gloves Boots

  9. Taping Gloves

  10. Can this attire be improved? Goggles, what more could you ask for?

  11. Monitoring Equipment Put in Place Dust monitor placed down-wind on site Personal dust monitor prepared to be placed on a site investigator

  12. The search for “Hazardous Substances” begins!

  13. Identifying the nature of samples pH tested Unpressurized can opened Visual inspection Organic vapors identified

  14. Data Recorded Team Beta Team Alpha

  15. “Confined Space” Team Readies The team has been well prepared! A perfect fit! Properly Identified

  16. Lifeline Secured Combustible Gas Meter (CGM) checked

  17. Checking the Atmosphere Ok given to begin Combustible Gas Meter (CGM) is lowered into the Confined Space

  18. Data Recorded Sample tested

  19. Environmental Site Survey Complete Removing Gloves Removing Boots