Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank. Visit to CERN/CMS Jan 2006. Attended meetings as part of CMS/CPT week. Tier0 planning, DQM, CCAR…
E N D
Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank Visit to CERN/CMS Jan 2006
Attended meetings as part of CMS/CPT week. Tier0 planning, DQM, CCAR… CMS is planning to have a center of activity on the Meyrin site in addition to the operations centre at Point 5. Space at Point 5 is limited and the Control Room is not large enough for all activities. The Meyrin centre is known as CCAR though this name will change. At this moment, there is no space at CERN assigned to this centre. There is a proposal to use a space that is currently occupied by the print shop and the mail room. This space belongs to the IT division but may be made available to CMS - negotiations underway. However, funds are not yet secure. Their space planning combines remote operations and other activities. They would like to work together with us on planning for remote operations. We met with Hans Hoffmann, Werner Jank and Sergio Cittolin to discuss our plans for LHC@FNAL. They will try to help us with security issues if we need it. We visited Point 5, the control room building and the CMS hall. http://boudin.fnal.gov/CMSFeb06.mov CERN/CMS visit
First years of data with CMS: Monitor the operation of the experiment - control in Cessy Near-line control of Data Quality, in particular by the sub detectors Control and operate the CMS use of the worldwide computing facility Functions to be covered: Conference room for ~200 persons Control and Monitoring Room for “near-line” activities of CMS Workplaces for combined Data Quality work Offices for Persons responsible for “near-line” activities CERN Visitor facilities Discussion areas CMS Meyrin Centre
Building 510 CCAR Work-area Work-area Meeting Technical Visitors; in/out-general print shop Coffee- discussion Monitoring/ Control room Conference Offices Offices
CCAR (possible) layout Towards Main Building Space breakdown Control room 1 150 m2 Conference room 1 300 m2 Meeting/VRVS room 1 70 m2 Technical room 1 80 m2 Group work room 1 140 m2 Office space 40 400 m2 Available cooling power 110kW Secr. Office Technical Collaborative work Meeting Visitors New printshop Control room Conference Visitors Office Office
Allow operations team to work effectively together! Facilitate communication of all kinds Technical communications Point 5 LHC control room Tier-0 CAF Outside facilities (Tier-1’s, Tier-2’s) People communications Between “operators” Subdetectors Calibration / alignment express line(s) (prompt) analysis groups Physics community Regular (daily/weekly) updates Become “Centre of Operations” CCAR Basic concept
Conference room (200+ people) Regular discussion meeting Daily to weekly, update collaborators Discuss status, short term plan, physics, … 2 big display screens CMS, LHC status Videoconferencing (VRVS) 2 wall projectors (VRVS, Local presentations) Excellent audio system (fixed + mobile microphones) Meeting room (50 people) Smaller, more dedicated discussions Physics, (sub)detector related Videoconferencing (VRVS) 2 wall projectors (VRVS, Local presentations) Good audio system (fixed microphones) Phone conferencing Good network access for both… Sufficient wall outlets for fixed DHCP Good WiFi coverage CCAR Meeting Rooms
Monitoring Initially used for monitoring, real CR at P5 only! Clone of Point-5 CR (to some extent) Acquire experience and confidence for control operations Understand sharing of responsibilities for distributed control Video link to Point-5 Detector status LHC status Physics displays Express line Event displays Histograms, data quality, … Webcam displays … Monitoring (Remote Control) Room - 1
(CMS Offline!) Computing operations Excellent communications with Point-5, IT and outside experts! Needed from the beginning! Making full use of IT facilities and services Tier-0, CAF COOL, 3D, LSF, AFS, Castor2 General services interactive service, build system, ORACLE, Monitoring GRID services RB, BDII, SE, CE, FTS, SRM, GridFTP, Myproxy Complementary CMS services Non-IT DBS, DLS admin and operation, fast File- and CPU servers, graphics servers,… Tier-1’s Phedex , Frontier, data management, heartbeat Monitoring (Remote Control) Room - 2
Infrastructure 15 - 20 people 2 big display screens for video link (VideoOverIP) CMS, LHC status 4 wall projectors Monitoring of detector, IT services, data quality, physics, … Also for VRVS when needed 4 - 6 Operators desks 3 graphics desktops Local VRVS Printer Phone 3 fixed network sockets for DHCP Good WiFi coverage 2 - 4 webcams Monitoring (Remote Control) Room - 3
For small groups 3 - 5 people each Allow experts to work together in close proximity Subdetector oriented 10 subdetectors Detailed (sub)detector monitoring Calibration, alignment Problems, performance, dead channels, … First pass data processing 5 physics analysis groups Hot trigger channels High priority, short latency data processing and analysis .. Flexible setup Easy reconfiguration to adapt to needs Standard configuration Work Areas - 1
(typical) Work Area Status Displays Physicist Keyboards Screens Phone Printer
Excellent network connectivity Very reliable and fast 1 GbEN for desktops To B513 (Tier-0, CAF) and Point-5 2 x 10GbEN Trusted network for Control Room (CMS domain) Secure interconnectivity GPN - LCG - CMS Access to lxplus, Tier-0, CAF and Point-5 public Wireless Coverage and speed CMS P5 LCG GPN CCAR Networking
CERN CMS Operations Centre? Remote Control Room Tier-0 operation CAF (calibration, alignment,…) DQM Physics Analysis Tier-1 data distribution, communication More (validation of concept, outreach,..) Goals very similar to LHC@FNAL and LPC at Fermilab We can/should work together to make these efforts a success. Summary