1 / 1

FRP/FD

A. B. C. FRP/FD. Engineering & Manufacturing Development. Operations & Support. Production & Deployment. Defense Acquisition Life Cycle Phase. Materiel Solution Analysis. Technology Development. Spectrum Supportability Risk Assessment (SSRA). Update SSRA. Update SSRA.

yestin
Download Presentation

FRP/FD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A B C FRP/FD Engineering & Manufacturing Development Operations & Support Production & Deployment Defense Acquisition Life Cycle Phase Materiel Solution Analysis Technology Development Spectrum Supportability Risk Assessment (SSRA) Update SSRA Update SSRA Prepare SSRA Update SSRA Update SSRA for mission & technical changes Stage 1 (Conceptual) Stage 4 (Operational) NTIA approval needed before deployment or when changes occur Stage 2 (Experimental) Stage 3 (Developmental) NTIA approval needed before transmission tests DD-1494, Application for Equipment Frequency Allocation Update E3 assessment for SSRA Update E3 assessment for SSRA Update E3 assessment for SSRA Resolve interference E3 assessment for SSRA Program Management, Systems Engineering, and Testers Electromagnetic Environmental Effects (E3) Tasks E3 & EME inputs to TEMP & ISP; HERO, HERP, HERF, TEMPEST, & EMI address at CDR; DT&E transmission tests after Stage 3 approval Conduct OT&E tests including E3 tests IAW TEMP; E3 assessment report Define EME & E3 requirements (i.e., frequency bands, throughput, power, operational areas, etc.) Update EME; Prepare E3 inputs to ISP, TEMP and acquisition documents; Address at PDR Deployed support Consider host nation (HN) constraints Maintain HN approval Obtain HN approval before deployment Obtain HN comments via SMO Begin HN discussions via SMO HERF – hazard of electromagnetic radiation on fuel HERO – hazard of electromagnetic radiation on ordnance HERP – hazard of electromagnetic radiation on personnel HN – host nation IAW – in accordance with NTIA – National Telecommunications and Information Administration CDR – Critical Design Review DT&E – developmental test and evaluation E3 – electromagnetic environmental effects EME – electromagnetic environment EMI – electromagnetic interference ISP – Information Support Plan OT&E – operational test and evaluation PDR – Preliminary Design Review SMO – spectrum management office SSRA – spectrum supportability risk assessment T&E – test and evaluation TEMP – Test and Evaluation Master Plan

More Related