Project Development Quality Program QA/QC – What does ODOT need?

Project Development Quality Program QA/QC – What does ODOT need?. ACEC/ODOT Conference March 7 & 8, 2006. Support Systems for Quality Projects. Research Policies & Procedures Training Technical Assistance Project Development Quality Program Design Performance Specifications

yitro
Download Presentation

Project Development Quality Program QA/QC – What does ODOT need?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Development Quality ProgramQA/QC – What does ODOT need? ACEC/ODOT Conference March 7 & 8, 2006

  2. Support Systems for Quality Projects • Research • Policies & Procedures • Training • Technical Assistance • Project Development Quality Program • Design Performance Specifications • Pre-Letting Review • Quality Control (QC) for Every Project • Quality Assurance “Audits” or Reviews • Quality Program Management

  3. Definitions • Design Performance Specifications • Common specifications for all design providers that set design expectations • Pre-Letting Review • Brief review of all projects for general completeness, major risk elements and readiness for advertisement for bids • Quality Control • Each Item Produced is Inspected (Quality Monitoring throughout Development of Project) • Quality Assurance • Only a Sampling of All Items Produced are Inspected (Quality Verification or Affirmation (Auditing)) • Quality Program Management • Ongoing evaluation to monitor, manage and improve provider performance and program performance

  4. Program Purpose • Provide for the Ongoing Engineering Quality of Plans, Specifications and Estimates of ODOT Projects • Manage the Consistency and Risk of Capital Construction Projects

  5. Program Roles & Responsibilities • Quality Control for Each Project is Provider Function • Defining Minimum QC Plan/Process is ODOT Function • Verification of Quality Control and Quality Assurance Reviews is ODOT Function • Coordinated & Managed by Technical Services

  6. PDQA Major Program Elements • Quality Control by Providers • Quality Assurance by Review Teams • Early Quality Evaluations for High Risk/High Profile Projects • Performance Management • Incentives & Assistance to Providers to Improve Performance • Overall program coordination by Roadway Engineering Pre-Letting Office

  7. Quality Control Plan Model • Model is List of What, Not How • List of Deliverables or Sub-Products for QC by Disciplines and Specialty Areas • Recommendations for Peer Reviews or Approval Reviews for Each Deliverable or Sub-Product • QC is Foundational Effort for Continued Project Quality - Must Happen for Each and Every Project!

  8. QC & PDQA Reviews Work Together Herd: Herd: Quality Control - Health Check Every Animal Herd: Quality Control - Health Check Every Animal Lasso One Out of the Herd: Quality Assurance – Health Audit, Thorough Physical for One Animal Quality Control - Health Check Every Animal Herd: Quality Control - Health Check Every Animal

  9. Project Development Quality Assurance • Spans Time from Scoping to Contract Award • Review or Audit of Project Design Quality • Standardized, Objective Criteria • Standardized Reports • Representative Sampling of Project Mix • Representative Sampling of Provider Mix • Triggers and Criteria to Select “Problem” Projects • Provider Performance Management • Incentives & Assistance to Project Development Providers to Improve Performance • Requirements for Corrective Action

  10. Review of Project Quality • Multi-discipline Approach • Primarily Tech Services Staff, but can also Include Tech Center Staff, Construction Staff, and Consultants • QA Review Criteria • Verification of Quality Control • Re-Creation of Peer and Approval Reviews • Discipline Focus QA • Focusing on Specific Disciplines

  11. PDQA Provider Guidebook • First Draft Included: • Intro and Background • QA Lite Checklists • Model QC Checklists • Performance Specification • Technical Review Forms • Lessons Learned Form

  12. Pre-Letting Reviews • Overview of projects going to bid • Complete Submittals due 24 days + ad length prior to bid let date • Checklists and PS&E guide are available on our website

  13. QA/QC – What does ODOT need? • Quality Control Plans from all Providers of Engineering Plans and Specs to ODOT • Complete PS&E packages 24 days + bid length prior to bid let date

  14. Website Resources and Contact Info Websites:www.oregon.gov/odot/hwy/qa www.oregon.gov/odot/hwy/opl Questions? Dustin.j.haas@odot.state.or.us (503) 986-3751