ECJ Parking lot redesign UT AUSTIN: Group 5

ECJ Parking lot redesign UT AUSTIN: Group 5. BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER. Overview. Define Study Area Current Operation & Problems Research & Design Challenges Calculations Final Design Decision Next Steps. Step 1: Representation. Step 1: Representation.

yori
Download Presentation

ECJ Parking lot redesign UT AUSTIN: Group 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECJ Parking lot redesignUT AUSTIN: Group 5 BENJAMIN CHILTON STEVEN ANDREW MARTIN ROSE SCHNEIDER

  2. Overview • Define Study Area • Current Operation & Problems • Research & Design Challenges • Calculations • Final Design Decision • Next Steps

  3. Step 1: Representation

  4. Step 1: Representation

  5. Step 2: Process • Average Annual Rainfall: 32.15 in • Roof flow piped directly into Waller Creek • Flow from parking lot to Waller Creek

  6. STEP 3: EVALUATION • Inadequate drainage • Unfiltered runoff • Large obtrusive wall • Erosion of soil • Uncontrolled flow • Wasted space

  7. Step 4: Change • Remove and replacethe existing wall • Porous pavement • Rain garden

  8. Porous Pavement • Pavement surface with a stone reservoir underneath • Temporarily stores surface runoff before infiltrating it into the subsoil • Incorporates void spaces that allow infiltration

  9. Rain Garden • Capture stormwater and provide for natural infiltration • Decrease flooding risks • Filter pollutants • Alleviate erosion

  10. Design Layout Total area: 35,300 ft2 Asphalt: 14,700 ft2 Porous pavement: 17,900 ft2 Rain garden: 2,717 ft2

  11. Step 5: Impact, Rain Garden

  12. Step 5: Impact, Porous Pavement

  13. Step 6: Decision