1 / 13

TMA Experience in Implementing CAP and its Role in SWFDP-EA as RFSC for Lake Victoria Basin

TMA Experience in Implementing CAP and its Role in SWFDP-EA as RFSC for Lake Victoria Basin. Hellen Msemo Tanzania Meteorological Agency Email: hmsemo@meteo.go.tz Twitter: helenaNjarita Facebook: hellenMsemo.

yosef
Download Presentation

TMA Experience in Implementing CAP and its Role in SWFDP-EA as RFSC for Lake Victoria Basin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TMA Experience in Implementing CAP and its Role in SWFDP-EA as RFSC for Lake Victoria Basin HellenMsemo Tanzania Meteorological Agency Email: hmsemo@meteo.go.tz Twitter: helenaNjarita Facebook: hellenMsemo WOLRD METEOROLOGICAL ORGANIZATION COMMON ALERTING Protocol (CAP) Implementation Workshop and JUMP_START Workshop Geneva, Switzerland, 23-25 April 2013

  2. Presentation Outline • Alerting Authority • Vision • Progress to date • Challenges • Future • Questions and Discussion

  3. Weather and Climate Hazards DMD CH ANNEL S Drought/dry spells WA R N I NG T EMP L A T E Heavy rains/Floods WANING CENTRE MEDIA Storms and Strong Winds Large waves PUBLIC Landslides CIVIL AUTHORITIES Tsunami

  4. Television PWS: Our Aim Television Timely Dissemination Information, Alert / Advisory and Warning to the Public for the Protection of Life and Property Radio/ Newspaper Common Alerting Protocol (CAP) Alerting, Responders Authorities Phone/SMS DMD, Red Cross, RC, DC, CSO etc. Teleconferencing Social Media PWS Alert/ Advisory/ Warning PUBLIC SIGNAGE 4

  5. Television Role of TMA in SWFDP-EA 5

  6. WRF

  7. Progress to date Presentation to Senior management and Tested within TMA

  8. Testing CAP

  9. Testing CAP

  10. List of contacts of various Stakeholders

  11. Challenges • Customizing our products information and dissemination systems to create and distribute XML/CAP formats • Display alerted area (Google Map) • How to link to photo/ picture

  12. FUTURE Implementing CAP by November,2013

  13. Thank you Asante Sana

More Related