1 / 20

Lunar Exploration Transportation System (LETS)

Lunar Exploration Transportation System (LETS). MAE 491 / 492 2008 IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein Final Review Presentation 4/29/08. Team Disciplines. The University of Alabama in Huntsville Team Leader: Matt Isbell

yoshe
Download Presentation

Lunar Exploration Transportation System (LETS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lunar Exploration Transportation System (LETS) MAE 491 / 492 2008 IPT Design Competition Instructors: Dr. P.J. Benfield and Dr. Matt Turner Team Frankenstein Final Review Presentation 4/29/08

  2. Team Disciplines • The University of Alabama in Huntsville • Team Leader: Matt Isbell • Structures: Matthew Pinkston and Robert Baltz • Power: Tyler Smith • Systems Engineering: Kevin Dean • GN&C: Joseph Woodall • Thermal: Thomas Talty • Payload / Communications: Chris Brunton • Operations: Audra Ribordy • Southern University • Mobility: Chase Nelson and Eddie Miller • ESTACA • Sample Return: Kim Nguyen and Vincent Tolomio

  3. Agenda • GN&C • Communications • Payload • Power • Thermal • Conclusions • Questions • Project Office • Systems Engineering • The Need • The Requirements • The Solution • Performance • Operations • Structures

  4. Project Office

  5. Systems Engineering

  6. The Need

  7. The Requirements

  8. The Solution

  9. Performance

  10. Operations

  11. Structures

  12. GN&C

  13. Communications • Rover • Parabolic Dish Reflector Antenna (PDRA) • T-712 Transmitter • Communication Bandwidth : X-band • Data Transmission Rate: 150 Mbps • Data Storage Capacity: 10 Gb • Penetrators • Omnidirectional Antenna • Communication Bandwidth: S-band • Data Transmission Rate: 8 Kbps • Data Storage Capacity: 300 Mb

  14. Communications/Payload • Single Site Box (SSB) • Determines lighting conditions every 2 hours for one year, micrometeorite flux, and assess electrostatic dust levitation • Omnidirectional Antenna • Communication Bandwidth: S-band • Data Transmission Rate: 8 Kbps • Data Storage Capacity: 1Gb • Surface Stereo Imager (SSI) • Mass: 10 Kg • Dimensions: 155x68.5x35.5 cm • Power: Solar Panel

  15. Payload • Gas Chromatograph Mass Spectrometer (GCMS) • Performs atmospheric and organic analysis of the lunar surface • Mass: 6 Kg • Dimensions: 10x10x8 cm • Power: Rover • Surface Sampler Assembly (SSA) • Purpose is to acquire, process and distribute samples from the moon’s surface to the GCMS • Mass: 15.5 Kg • Dimensions: 110X10X10 cm • Power: Rover

  16. Payload • Penetrators (Deep Space 2 ) • Mission’s main source of data acquisition in the permanent dark regions • Mass (15 Penetrators): 53.58 Kg • Dimensions: 13.6Dx10L cm • Power: 2 Lithium Ion Batteries Ea. • Miniature Thermal Emission Spectrometer (Mini-TES) • Objective to provide measurements of minerals and thermo physical properties on the moon • Mass: 2.4 Kg • Dimensions: 23.5x16.3x15.5 cm • Power: Rover

  17. Power

  18. Thermal

  19. Conclusions

  20. Questions

More Related