1 / 8

ISPE

ISPE. SIG HVAC. SIG HVAC. Active since 2001 Group meets two to three times a year on average 5 companies attending the meetings meetings last typically from 10.00 to 13.00 hours. SIG HVAC. Fixed dates for meetings in 2004 March / September / November Easier to plan and to attend.

Download Presentation

ISPE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISPE SIG HVAC

  2. SIG HVAC • Active since 2001 • Group meets two to three times a year • on average 5 companies attending the meetings • meetings last typically from 10.00 to 13.00 hours

  3. SIG HVAC • Fixed dates for meetings in 2004 • March / September / November • Easier to plan and to attend

  4. SIG HVAC • Recent subjects covered • Modular programming of PLC’s (October 2003) • ISO standard 14644 (November 2003) • Energy management in cleanroom environments (March 2004) • Planned • Visit of technical installations GSK (September 2004)

  5. SIG HVAC • Planned subjects • Risk analyses on HVAC installations • Issues with respect to ER/ES • Disinfection of cleanrooms, e.g. H2O2 • testing methods on fume hoods: EN-14175-2 versus ASHRAE norm 110

  6. SIG HVAC • Planned sub-subjects • compromises between GxP’s and safety • HEPA filtration: benchmarking of suppliers • Maintenance strategies with respect to HVAC installations • Positive pressure control in cleanrooms

  7. SIG HVAC - comments • guest speakers - working well • presence of consultants / engineering companies - positive

  8. SIG HVAC - conclusions • objectives set at the beginning of the SIG group are being met: • platform for exchange between pharmaceutical companies • enhances networking • present meeting frequency is doable • enough subjects for future meetings

More Related