An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 9A Process Capability and SPC

  2. Learning Objectives • Explain what statistical quality control is. • Calculate the capability of a process. • Understand how processes are monitored with control charts. • Recognize acceptance sampling concepts.

  3. Types of Situations where SPC can be Applied • How many paint defects are there in the finish of a car? • How long does it take to execute market orders? • How well are we able to maintain the dimensional tolerance on our ball bearing assembly? • How long do customers wait to be served from our drive-through window? LO 1

  4. What Is Quality? • How do you define quality? • Durability, reliability, long warrantee • Fitness for use, degree of conformance • Maintainability • Measures of quality • Grade—measurable characteristics, finish • Consistency—good or bad, predictability • Conformance—degree product meets specifications • Consistency versus conformance

  5. Basic Forms of Variation • Assignable variation: caused by factors that can be clearly identified and possibly managed • Example: a poorly trained employee that creates variation in finished product output • Common variation: variation that is inherent in the production process • Example: a molding process that always leaves “burrs” or flaws on a molded item LO 1

  6. Variations Around Us • When variation is reduced, quality is improved • However, it is impossible to have zero variation • Engineers assign acceptable limits for variation • The limits are know as the upper and lower specification limits • Also known as upper and lower tolerance limits LO 1

  7. Taguchi’s View of Variation • Traditional view is that quality within the range is good and that the cost of quality outside this range is constant • Taguchi views costs as increasing as variability increases, so seek to achieve zero defects and that will truly minimize quality costs • Society loses (pays) for poor quality • Design products/processes impervious to variations • Use experimental/robust design • Shoot for target not conformance to specifications LO 1

  8. Process Capability • Taguchi argues that tolerance is not a yes/no decision, but a continuous function • Other experts argue that the process should be so good the probability of generating a defect should be very low LO 2

  9. Process Capability • Process (control) limits • Calculated from data gathered from the process • It is natural tolerance limits • Defined by ±3σ (standard deviation) • Used to determine if process is in statistical control • Tolerance (specification) limits • Often determined externally, e.g., by customer • Process may be in control but not within specification • How do the limits relate to one another?

  10. Process Capability LO 2

  11. Process Capability • Case 1: Cp > 1 • USL-LSL > 6 sigma • Process quality higher than customer’s • Situation desired • Defacto standard is 1.33+ LSL USL LNTL UNTL

  12. Process Capability • Case 2: Cp = 1 • USL-LSL = 6 sigma • Approximately 0.27% defectives will be made • Process is unstable LSL USL LNTL UNTL

  13. Process Capability • Case 3: Cp < 1 • USL-LSL < 6 sigma • Situation undesirable • Process is yield sensitive • Could produce large number of defectives LNTL UNTL USL LSL

  14. Process Capability Index, • Most widely used capability measure • Measures design versus specification relative to the nominal value • Based on worst case situation • Defacto value is 1 and processes with this score is capable • Scores > 1 indicates 6-sigma subsumed by the inspection limits • Scores less than 1 will result in an incapable process

  15. Capability Index (Cpk) • Capability index (Cpk) shows how well parts being produced fit into design limit specifications • Also useful to calculate probabilities LO 2

  16. Example: Capability • Data • Designed for an average of 60 psi • Lower limit of 55 psi, upper limit of 65 psi • Sample mean of 61 psi, standard deviation of 2 psi • Calculate Cpk LO 2

  17. What does a Cpk of 0.6667 mean? • An index that shows how well the units being produced fit within the specification limits. • This is a process that will produce a relatively high number of defects. • Many companies look for a Cpk of 1.3 or better… 6-Sigma companies want 2.0!

  18. Example: Probabilities LO 2

  19. Process Control Procedures • Attribute (Go or no-go information) • Defectives refers to the acceptability of product across a range of characteristics. • Defects refers to the number of defects per unit which may be higher than the number of defectives. • p-chart application • Variable (Continuous) • Usually measured by the mean and the standard deviation. • X-bar and R chart applications LO 3

  20. Control Chart Evidence for Investigation LO 3

  21. Process Control with Attribute Measurement: Using ρ Charts • Created for good/bad attributes • Use simple statistics to create the control limits LO 3

  22. Example: Control Chart Design LO 3

  23. Example: Calculations LO 3

  24. Process Control with Attribute Measurements: Using c Charts • With ρ charts, each item was either good or bad • With a c chart, each item can have multiple defects LO 3

  25. Example: Lumber Yard • Lumber yard expects four knotholes per eight foot board LO 3

  26. Process Control with Variable Measurements: Using x and R Charts • In variable sampling, we measure actual values rather than sampling attributes • Generally want small sample size • Quicker • Cheaper • Samples of 4-5 are typical • Want 25 or so samples to set up chart LO 3

  27. How to Construct x Charts if Standard Deviation Known LO 3

  28. How to Construct x and R Charts LO 3

  29. Example: The Data LO 3

  30. Example: Calculations and Chart LO 3

  31. Acceptance Sampling • Acceptance sampling is sampling to accept or reject the immediate lot of product at hand • Does not always “Determine quality level” • Results subject to sampling error • Purposes • Make decision about (sentence) a product • Otherwise, ensures quality is within predetermined level LO 4

  32. Acceptance Sampling • Advantages • Economy • Less handling damage • Fewer inspectors • Upgrading of the inspection job • Applicability to destructive testing • Entire lot rejection (motivation for improvement) • Disadvantages • Risks of accepting “bad” lots (consumer’s risk) and rejecting “good” lots (producer’s risk) • Added planning and documentation • Sample provides less information than 100-percent inspection

  33. Single Sampling Plan • Defined by n and c • n is sample size—how many to sample at a time • c is the acceptance number—the maximum number of defective items that can be found in the sample before the lot is rejected • Values for n and c are determined by the interaction of four factors • AQL or acceptable quality level • α • LTPD or lot tolerance percent defective • β LO 4

  34. Risk • Acceptable quality level (AQL) • Maximum acceptable percentage of defectives defined by producer • The  (producer’s risk) • The probability of rejecting a good lot • Lot tolerance percent defective (LTPD) • Percentage of defectives that defines consumer’s rejection point • The  (consumer’s risk) • The probability of accepting a bad lot LO 4

  35. Standard Table of Sampling Plans • MIL-STD-105D • For attribute sampling plans • Needs to know: • The lot size N • The inspection level (I, II, III) • The AQL • Type of sampling (single, double, multiple) • Type of inspection (normal, tightened, reduced) • Find a code letter then read plan from Table

  36. Standard Table of Sampling Plans: Single Sampling Plan Example: If N=2000 and AQL=0.65% find the normal, tightened, and reduced single sampling plan using inspection level II. Example: If N=20,000 and AQL=1.5% find the normal, tightened, and reduced double sampling plan using inspection level I.