1 / 7

Prior checking – other procedural issues

Prior checking – other procedural issues Tereza Struncova. two months after receipt of the notification, i.e. 61 calendar days unless suspension or extension…. Deadline Art. 27(4)1 DPR. for additional information

yves
Download Presentation

Prior checking – other procedural issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prior checking – other procedural issues Tereza Struncova

  2. two months after receipt of the notification, i.e. 61 calendar days unless suspension or extension… Deadline Art. 27(4)1 DPR

  3. for additional information when elaborating the draft opinion for comments on the draft opinion pending adoption of thematic guidelines August suspension possible suspension for other lengthy public holidays applicable on a case-by-case basis SuspensionsArt. 27(4)2 DPR

  4. for up to two months due to complexity of the matter by decision of the EDPS notified to the controller before the expiry of the initial two-months period Extension Art. 27(4)3-4 DPR

  5. full compliance with the Data Protection Regulation needs to be ensured measures implementing the EDPS recommendations to be adopted by the controller within three months after adoption of the respective opinion EDPS needs to be notified about it (so that the case can be closed) Follow upArt. 27(4)6 DPR

  6. before adoption of the EDPS opinion TO BE AVOIDED already existing EDPS opinion  DPO has to determine whether the modification of the particular procedure significantly affects the data protection aspects as already examined by the EDPS Modification of already submitted notifications

  7. Any questions??

More Related