An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Consolidation AD Gilles Le Godec / David Nisbet TE/EPC 2/11/2009

  2. Introduction - AD Experiment • Background • Accelerator already much past design lifetime • Research program now approved until 2014 – probable extension to 2016 • Priority for EPC: improvereliability of agingequipment • Consolidation proposal by the AD team: EDMS xxxxxx • In addition, extension of existingresearch program • AEGIS • PAX or ELENA

  3. Consolidation … MPC Section

  4. AD Ring Q-TRIM power converters • Modification of existing Danfysik converters (Q-trim 1-2-3-5 and B-trim) to ensure future serviceability. Prototyping/tests of 1 unit foreseen in 2009 and installation as of 2010 (turn over of the existing converter over a few years). • Replacement of ageing Q-trim4 with a new unit.

  5. BTI247S - BMAIN – QMAIN spare components • No spare unit (inductance + transformer) exists for the BTI247S switching dipole converter (TT2 to AD target). • No spare unit (inductances) exists for B-main and Q-main converters.

  6. AD ejection Line power converters • Replacement of ageing converters: 10 of the converters for the ejection line magnets are old and are getting difficult to maintain in a good operational state. Foreseen is the replacement with new units (Heinzinger).

  7. Budget MPC

  8. Consolidation … FPC Section

  9. AD injection/ejection Line • Consolidation of ageing P4KV capacitor discharge converters • All converters in building 370 • Converters are more than 30yrs old • Many interventions for failing capacitors (7 in 2008, 15 in 2009) • Other components such as short circuit switches are becoming unreliable with limited spares • Initial request to consolidate all Building 370 too expensive (1.2MCHF) • Half budget awarded, recently increased to 650kCHF • Proposal • Replace 5x converters with new systems – thus creates extra spares • Replace capacitors of 7x existing systems (plus spares)

  10. AD injection/ejection Line

  11. AD injection/ejection Line • When using maxidiscap or megadiscap converters, the current ramp is modified • Existing converters use LC resonance • New converters have controlled flat-top • Reproducibility improved, with energy saving possibilities • AD only requires beam every ~100s • Existing LC circuit requires 2.4s cycles to maintain thermal properties

  12. AD injection/ejection Line • Maxidiscap • Propose to test on existing circuit during 2009/2010 shutdown • Expect system to become operational after shutdown • Precision • Absolute: 1% • Reproducibility: 5 x 10-4 • Quantities • 1x operational • 1x operational spare

  13. AD injection/ejection Line • Megadiscap • Validation of design nearly complete • Precision • Absolute: 1% • Reproducibility: 5 x 10-4 • Increase in rms current requires some components to change • AD circuits have higher inductance compared to LINAC4 PSB (SMV circuits) • However all systems nearly identical (topology, controls, etc) • Quantities • 4x operational • 1x operational spare • Production of Megadiscap for LINAC4 and AD at same time? • Benefit from development and production synergies • Installation of 4+1 AD systems in March 2011 • Installation of 3+1 LINAC4 PSB systems in 2012

  14. Budget FPC

  15. New Projects…

  16. AD AEGIS Experiment • Experimentdesigned to trap anti-hydrogenatoms • Anticipatedrequirements: • Cost: ~60kCHF • Schedule: 2010??

  17. PAX Experiment • Installation of new quadrupoles in the ring: new power converters (Switchmode + PS Electronic) 35V-400A : Qty = 2 50V-700A : Qty = 2 70V-600A : Qty = 2 Schedule: ??

  18. ELENA Ring • In order to improve the trapping efficiency at the main AD experiments, a small additional decelerator&cooling ring has been proposed. ELENA is situated in the existing AD-Hall between the AD ring and the experimental area. Power converters Estimation = 860 kCHF (A.Beuret) Type: To be Defined Schedule: ?? Remark: according to T.Ericksson, It is not possible for the AD team to drive 2 projects in parallel (PAX+ELENA)  a choice shall be made…