An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONTRACT INFORMATION and MONITORIING SYSTEM (CIM) Where is it?

  2. Click CIM

  3. Value Added Feature (VAF) User Guide

  4. Review the VAF User Guide • 1. Value Added Features • A. Accessing Value Added features • B. Viewing Specific Features and Inspections • C. Viewing Feature Details • 2. Adding new Value Added Features • A. Creating New Value Added Features • 3. Editing a Value added Feature • A. Changing The General Information • B. Adding Notes • C. Adding Files • D. Adding Issues • E. Viewing and Adding Contacts to a Value Added Feature • F. Viewing and Adding Locations • 4. Adding Inspections to a Feature • A. Creating a New Inspection • B. Adding a Single Inspection • C. Scheduling Multiple Inspections

  5. WARRANTY CORDINATORS • Value Added Features (Warranty) Coordinator List • Larry W. Stone              MT 510LS      386-943-5292 District Operations       • Chris Eckert                  MT538MCE   386-740-3452 Structures and Facilities              • Raphael St. Juste          CN514SR 321-690-3250 Brevard Operations • James Read                  MT591JR       386-740-3406 DeLand Maintenance • Joe Remic                    CN515RJ       352-326-7731 Leesburg Operations • Mike Danos                 MT593MD      407-977-6530 Oviedo Maintenance • Mike Cress MT594HMK 407-858-5900 Orlando Maintenance • Charlie Wells                MT595CW     352-620-7489 Ocala Operations

  6. Why was the VAF area of CIM created?

  7. Feature Type, Cost Center, Feature Begin Date.

  8. Viewing and adding new Value Added Features (VAF)

  9. Value Added Features come up.

  10. TRAFFIC STRIPES AND MARKINGS

  11. What if there are no Features entered?You’ve got to enter them.

  12. Add Feature link.

  13. Feature Type & Cost Center drop-down

  14. Adding Notes

  15. Adding Notes (Continued)

  16. Adding files or pictures.

  17. Adding Issues to VAF

  18. ADDING ISSUES

  19. Viewing, Adding Contacts & Locations to a VAF

  20. Click Contacts on the right side

  21. VIEW AND/OR ADD CONTACTS

  22. Click at left - Contacts

  23. Contacts (continued)

  24. Adding Inspections to a Feature

  25. Inspections continued

  26. ASPF=Asphalt, AVPM=Audible & Vibratory Pavement Markings, ITS-1= ITS Warranty items, TSM= Traffic Stripes & Markings, etc.

  27. Click on Asphalt

  28. INSPECTIONS SCHEDULED

  29. How to schedule multiple inspections.

  30. What about the Traffic stripes and Markings? No inspection is scheduled.

  31. Pavement Markings Inspection

  32. Several warranty items or VAF are now part of the Specifications.

  33. Value Added Portland Cement, Bridge Components, Performance Turf, Remember some of these are just for Design Build

  34. SUGGESTION: • 1. All warranty items 2 years and greater should be on an annual inspection frequency, i.e. Asphalt for 3 years would be 1 per year for 3 years. Concrete for 5 years would be 1 per year for 5 years, etc. • 2. Warranties less than 1 year should be semi-annual or 1 per 6 months. • 3. Landscape requires monthly inspections that the plants have been installed and are being maintained per Contract Documents, a Registered Landscape Architect will oversee. The Contractor’s Quality Control representative must perform quarterly inspections of planting areas and submit report. 580-3.6

  35. Example:ASPHALT WARRANTY - 3 YEARS

  36. Schedule 90 day inspection prior to end warranty date, gives time if there are any issues.Click Add Single Inspection, Click calendar, find date and click to enter in dialog box. Click Add button to save.

  37. After inspections are made. Update CIM with Actual Inspection Date

  38. Click Edit to update.

  39. Click in Actual Inspection Date dialog box.

  40. EXAMPLES:ASPHALT VAF / Problem Detected & Good Documentation of Actions taken.

  41. Example: Feature Begin Date 11/24/2008, Feature End Date 11/25/2008 - Final Inspection 11/24/2011?

  42. Example: Feature End Date Inspection Date are the same? What if we have a problem?

  43. Example: What wrong with this picture?Final Inspection date

  44. Example: FINAL INSPECTION IS WHEN?

  45. DO WE NEED CHANGES? WHAT WOULD MAKE CIM BETTER? Questions? Is the system working for you? How can the inspection process be improved? Suggestions/comments are being compiled and will be sent to the Central Office when training is completed.

  46. Recommendations/Suggestions • Leesburg Operations (Joe Remic’s suggestions ). • 1. Is it possible to restrict the CIM auto-report feature to a specific range; such as unique individual or grouped Cost Centers? • For example, working in District 5 - Leesburg Operations, is Lake & Sumter Counties, or Cost Centers 515 & 592. These are the only notices needed regarding any “advance” and/or “past due” inspections. • 2. The CIM system software should provide the Cost Center number(s) at the beginning of the email subject line. • District Office (Larry, Mike suggestions). • 1. Program CIM to send notices to select Cost Centers in each District i.e. 509, 512, 514 etc. 2. Program the Value Added Features in CIM based on the Pay Item Numbers. Each Pay Item could generate the intervals, and number of inspections to be made. Allow for ability to over-ride for different circumstances. 338 Asphalt Pavement= 3 inspections performed annually, 335 Portland Cement Concrete Pavement= 5 inspections performed annually. Performance Turf= 1 inspection performed annually, Performance Based Pavement Markings, etc. 3. When entering Feature Begin & End Dates, program calendar date to move from year to year as well as month to month. Loreen Bobo suggests: 1. Add a line for Maintenance Cost Center, and change the title of the current ‘Cost Center’ line to ‘Construction Cost Center’. James Read suggests: 1. When inspections are made and comments noted in CIM, have the system send those comments to the VAF Coordinator, the PA and the P.M. System would need to have those names on record. 2. Send notifications to select Cost Centers As of 5.1.2010 • Dan Eisman: • 1.Program the system to populate the final inspection date approximately 30 days prior to End Warranty or End Feature Date. This will give the PA/Department sufficient time to address deficiencies or problems that may be discovered before the warranty ends. Larry Stone or Mike Wright at District Five Maintenance CC 510.

  47. CIM TEST ENVIRONMENT SITE http://tlbstws2.dot.state.fl.us/ContractInformationMonitoring/SearchCriteria.aspx

  48. THE END