120 likes | 345 Views
PRESENTATION ON FOIS & COIS. BLOCK DIAGRAM OF FOIS SYSTEM. P. C. FIBRE TERMIATION BOX. I/O BOX. OFC. FIBRE DISTRIBUTION FRAME BOX. PATCH PANEL. ADD & DROP MUX. SWITCH. DATA CARD. ROUTER. G 703 MODEM. V 35
E N D
PRESENTATION ON FOIS & COIS
BLOCK DIAGRAM OF FOIS SYSTEM P. C. FIBRE TERMIATION BOX I/O BOX OFC FIBRE DISTRIBUTION FRAME BOX PATCH PANEL ADD & DROP MUX SWITCH DATA CARD ROUTER G 703 MODEM V 35 MODEM
FOIS PHASE – I • TOTAL NO. OF LOCATION IN EAST COAST RAILWAY 15 • COMMISSIONED 15 • WAT DIVISION 8 • KUR DIVISION 5 • SBP DIVISION 1 • H.Q. 1
FOIS PHASE -II • TOTAL NO. OF LOCATIONS IN ECoR 38 • WAT DIVISION 18 • SBP DIVISION 7 • KUR DIVISION 13
FOIS PHASE –II • TOTAL NO. OF LOCATIONS IN ECoR 38 • VSAT LOCATIONS 17 • RAILWAY O.F.C. 17 • LAN EXTENDERS 4
FOIS PHASE - II • TOTAL LOCATIONS 38 • COMMISSIONED ON O.F.C. 13 • COMMISSIONED ON LAN EXTENDER 3 • COMMISSIONED ON VSAT 0 • TOTAL COMMISSIONED 16
FOIS PHASE - II • MATERIALS REQUIRED FOR OFC • 3 LOCATIONS: ROUTERS • 1 LOCATION : DATA CARD • MATERIALS REQUIRED FOR LAN EXTENDER 1. 1 LOCATION : U.G.CABLE
PROGRESS OF COIS WORKS • TENDERS IN DIVISION TO BE FLOATED • TOTAL LOCATIONS 6 • SITE READY 4 • S&T WORK DONE 4 • S&T MATERIAL REQUIRED ROUTERS, U.G. CABLE
VSAT LOCATIONSTO BE COMMISSIONED • TOTAL IN E.Co.R.21 • WAT DIV 13 • KUR DIV 8 • SBP DIV 0
REQUIREMENTS • ROUTER (4 PORTS) 11 No. • ROUTER (12 PORTS) 3 No. • ROUTER (24 PORTS) 5 No. • MODEMS (64 KB/S) 24 Pairs • ROUTERS (4 PORTS) LOCATIONS PSA,MSMD, KSNG, BBS, CTC, DNM,JJKR,DNKL,SKND,PUI. • ROUTERS(12 PORTS) R,CSPR,BHC • ROUTERS(24 PORTS) KUR,WAT,RGDA,TIG,SBP