1 / 17

Presentation by Phil Bloor

Presentation by Phil Bloor. Agenda. Company History Core Business Details of major services. Company history. 1976 - Started by designing & building retail petrol stations & bulk fuel storage depots

Download Presentation

Presentation by Phil Bloor

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Presentation by Phil Bloor

  2. Agenda Company History Core Business Details of major services

  3. Company history 1976 - Started by designing & building retail petrol stations & bulk fuel storage depots 1996 – Switched to full time diagnostic testing of tanks, lines & vapour recovery systems 2004 – Designed and built our first mobile tank cleaning machine 2006 –Added road tanker inspection & testing to our core business 2009 – E&S Merge with the Adler & Allan group

  4. Core Business • Fuel Additives • Inspection video camera • Leak detection in underground pipework • Vapour Recovery Testing • Road tanker testing • Tank & Line testing • Mobile tank cleaning & fuel maintenance

  5. E&S Fuel Additives • Improves combustion • Reduces carbon deposits • Reduces gums & resins • Improves spray patterns • Reduces smoke emissions • Reduces mechanical wear • Extends filter & component life • Lowers fuel consumption • Cleans injectors & nozzles • Improves power output

  6. Inspection Video Camera • Intrinsically safe fibre optic camera • Used in pipelines and underground fuel tanks • High resolution pictures – pinpoints areas of corrosion or decay • Permanent record of pipe/tank condition • …

  7. Leak Detection • Pinpoints exact location of leak in the underground pipework • Saves unnecessary excavations and site disruption • Gas injected in pipe detected at point of escape by ‘sniffer’ on surface • Major time & money saver

  8. Stage 1&2 Vapour Recovery Testing • Vapour recovery systems tested – Stage 1b & stage 2 – full repair .. maintenance service • All parts carried on the vehicles to avoid any re-visits • All Vehicles fitted with a ‘cherry picker’ or scaffold to meet working at • height regulations

  9. Road Tanker Testing • Full UKAS accreditation against ISO17020 ref. CDG 2007 (SI 1573) • Department of Transport appointed Type A Inspection Body • covering: • DR6 (old tanks) DR5/ADR (new tanks), 6-year hydraulic tests

  10. Tank & Line Testing • Use MassTech system – world renowned science based technology • Can test any liquid at any level in the tank – full to empty • Routinely tests for leaks @ 0.083 litres per hour (2 litres per day), • much less than the standard of 0.38 litres per hour (9 litres per day) • Only system to have EPA certification for line testing

  11. Mobile tank cleaning • E&S designed & built units • Safe, reliable and highly effective • Vehicle mounted with all necessary ancillary equipment • Incorporates – water separator, rust particle remover, up to 10 filters …that, graduated down to 2&3 micron • High pumping capacity • Sight glasses for visual inspection • Waste material safely removed & disposed off site • Machines range from 3,000 to 84,000 litres per hour

  12. Mobile tank cleaning machines 3,000 litres per hour 7,000 litres per hour 84,000 litres per hour

  13. Mobile Tank Cleaning • Mobile tank cleaning machine – removes water, sludge and other .. ….contaminants • Restores fuel to pristine condition • Use of a fuel biocide to kill off bacterial growth • Cleans tank and lines at the same time • Important tanks are water free at all times • …

  14. Mobile tank cleaning • Lines pigged & backflushed • Filters cleaned • ACV filter kits inserted as additional protection • Nozzle filters, ‘witches hats’, gaskets cleaned or replaced

  15. PPM Tank Maintenance • Follow up maintenance programme recommended • Typically every six months • Water free certificate issued following inspection, water • removal and clean • Re-dose with de-watering agent • Data base management • Confidential access to E&S web site for all certificates & documentation

  16. Sample Pictures

  17. E&S working to maintain the highest standards in fuel quality and environmental compliance Question & Answers

More Related